BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 18, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a civil project in Santa Clarita, California. Completed plans call for site work for a water / sewer project.

The work consists of stormwater management improvements at the Valencia Water Reclamation Plant, including replacing a pump (with power and controls), installing precast vaults and catch basins, modifying an electric switchgear, installing a flow meter, constructing a sampling location, and making various grading and pavement improvements across the site. At the Saugus bypass gate structure within the Green Landscape Nursery, work includes installing a new bypass gate structure with a gate actuator, and relocating and replacing the existing control panel to be closer to the new structure. Each prime contractor intending to bid must attend a mandatory jobsite walk-through. Bids must be prepared and submitted electronically in accordance with the Bid Documents, Plans, Special Provisions, Standard Specifications for Public Works Construction, 2024 Edition, including Los Angeles County Sanitation Districts Amendments, and any issued addenda. Bidders must obtain the Bid Documents through QuestCDN for a nominal non-refundable fee. Only those bidders who have obtained and properly downloaded the Bid Documents may submit an electronic bid. Questions regarding the project will only be accepted via the online electronic Q&A feature through QuestCDN. The last day for submitting questions is five working days prior to the bid opening. Each bid must be accompanied by a certified check, cashier’s check, or bid bond for at least ten percent of the amount bid. The successful bidder must provide performance and labor/material bonds. At the time of bid, the contractor must possess a valid California Contractor’s License in the General Engineering "A" classification. Bidders must comply with prevailing wage laws and be registered with the California Department of Industrial Relations. The work of construction must be completed within 210 working days after the Notice to Proceed. Question Deadline 04/28/2026 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$3,892,506.00

Public - County

Site Work

104

14

8

7

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
642
Active Projects
334
Bidding Soon
4,204
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2026

July 6, 2026

Project location map

Multiple Locations, Santa Clarita, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.