Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 10, 2026 at 8:00 PM
Updated May 20, 2026
Demolition, site work and new construction of a fire / police facility in Winnipeg, Manitoba. Completed plans call for the construction of a 6,500-square-foot fire / police facility.
Expansion of the McKenzie Clearwater Fire Protection Corporation - Clearwater Bay Fire Hall, including the construction of a replacement Fire Hall building of approximately 6,500 ft2 (604 m2) to the east of the existing fire hall, which will remain as a storage building. The scope includes replacement of the existing well, capping and abandoning the original, installation of a new well and a water treatment system in accordance with MECP treatment guidelines, and expansion or replacement of the existing septic field to accommodate additional washrooms as per the Ontario Building Code. Removal of the existing garage shed to the east of the fire hall is required to provide space for the new building. A secured fenced area for storage near the fire hall is also required for winter boat storage, large training props, and a Seacan for additional cold storage. Proposals must be submitted electronically in PDF format with separate, clearly labeled documents for the technical and fee sections. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Question Deadline 03/23/2026 at 7:00 PM CT
Post-Bid
Fire / Police
$3,000,000.00
Public - City
Demolition, New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 9, 2026
May 24, 2026
91 Scurfield Blvd., Winnipeg, MB
Related To This Project
Winnipeg, MB
Bid Date: Apr 15 2026
Winnipeg, MB
Bid Date: Mar 27 2026
Winnipeg, MB
Bid Date: Mar 31 2026
Winnipeg, MB
Bid Date: Mar 25 2026
Winnipeg, MB
Bid Date: Apr 02 2026
Winnipeg, MB
Bid Date: Mar 31 2026
Winnipeg, MB
Bid Date: Apr 02 2026
Winnipeg, MB
Bid Date: Mar 27 2026
Winnipeg, MB
Bid Date: Mar 26 2026
Winnipeg, MB
Bid Date: Mar 20 2026
Winnipeg, MB
Bid Date: Apr 07 2026
Winnipeg, MB
Bid Date: Apr 07 2026
Winnipeg, MB
Bid Date: Apr 13 2026
Winnipeg, MB
Bid Date: Apr 01 2026
Winnipeg, MB
Bid Date: Mar 25 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
