Published April 15, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a pipeline in Cartersville, Georgia. Completed plans call for site work for a pipeline.

The principal items of construction are: 4,400 L.F. - 8-5/8" O.D.-.219" W.T., F.B.E. Coated, ERW X42/X52 Steel Line Pipe 1,760 L.F. - 8-5/8" O.D.-.322" W.T., F.B.E./2040 Coated, ERW X42/X52 Steel Bore Pipe 415 L.F. - 6-5/8" O.D.-.280" W.T., F.B.E./2040 Coated, ERW X42/X52 Steel Bore Pipe 570 L.F. - 8" Directional Bore (Sta. 41+30 to Sta. 35+60) 360 L.F. - 8" Directional Bore (Sta. 41+60 to Sta. 45+20) 370 L.F. - 8" Directional Bore (Sta. 1+90 to Sta. 5+60) 355 L.F. - 6" Directional Bore (Sta. 46+00 to Sta. 49+55) TOYO TIRE NORTH AMERICA/ZION ROAD DEVELOPMENT AREA PHASE V: IDI NORTHWEST 75 TO PETTIT CREEK/TOYO TIRE NORTH AMERICA/ZION ROAD DEVELOPMENT AREA PHASE VI: BEAUFLOR USA TO IDI NORTHWEST 75 CARTERSVILLE PROJECT NO. CP-04-002-V/CP-04-002-VI Natural gas main extension toyo tire north america/zion road development area phase v: idi northwest 75 to pettit creek/toyo tire north america/zion road development area phase vi: beauflor usa to idi northwest 75 cartersville One Contract shall be awarded covering all work and the maximum time for completion shall not exceed 90 consecutive calendar days from the starting date specified in the Notice to Proceed. Bidders must agree to pay as liquidated damages the sum of $200.00 per each consecutive calendar day thereafter. Due consideration will be given to delivery of materials in specifying starting date. Bids must be accompanied by a Certified Check or Bid Bond in an amount equal to not less than five percent (5%) of the bid to be considered. No bid may be withdrawn after the scheduled closing time for receiving bids for a period of sixty (60) days. The Owner reserves the right to accept or reject in whole or in part any or all bids and to waive formalities and re-advertise. Doc Notes: Plans, specifications and contract documents are open to public inspection at the City of Cartersville Gas System offices located at 155 Old Mill Road, Cartersville, Georgia 30120. The Gas System offices may be contacted by telephone at 770.387.5642 or by mail at P.O. Box 1390, Cartersville, Georgia 30120. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Bid Results

Pipeline

$1,099,240.00

Public - City

Site Work

25

5

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
321
Active Projects
174
Bidding Soon
2,319
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2026

May 4, 2026

Project location map

Multiple Locations, Cartersville, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.