Site work for a pipeline in Cartersville, Georgia. Completed plans call for site work for a pipeline.
The principal items of construction are: 4,400 L.F. - 8-5/8" O.D.-.219" W.T., F.B.E. Coated, ERW X42/X52 Steel Line Pipe 1,760 L.F. - 8-5/8" O.D.-.322" W.T., F.B.E./2040 Coated, ERW X42/X52 Steel Bore Pipe 415 L.F. - 6-5/8" O.D.-.280" W.T., F.B.E./2040 Coated, ERW X42/X52 Steel Bore Pipe 570 L.F. - 8" Directional Bore (Sta. 41+30 to Sta. 35+60) 360 L.F. - 8" Directional Bore (Sta. 41+60 to Sta. 45+20) 370 L.F. - 8" Directional Bore (Sta. 1+90 to Sta. 5+60) 355 L.F. - 6" Directional Bore (Sta. 46+00 to Sta. 49+55) TOYO TIRE NORTH AMERICA/ZION ROAD DEVELOPMENT AREA PHASE V: IDI NORTHWEST 75 TO PETTIT CREEK/TOYO TIRE NORTH AMERICA/ZION ROAD DEVELOPMENT AREA PHASE VI: BEAUFLOR USA TO IDI NORTHWEST 75 CARTERSVILLE PROJECT NO. CP-04-002-V/CP-04-002-VI Natural gas main extension toyo tire north america/zion road development area phase v: idi northwest 75 to pettit creek/toyo tire north america/zion road development area phase vi: beauflor usa to idi northwest 75 cartersville One Contract shall be awarded covering all work and the maximum time for completion shall not exceed 90 consecutive calendar days from the starting date specified in the Notice to Proceed. Bidders must agree to pay as liquidated damages the sum of $200.00 per each consecutive calendar day thereafter. Due consideration will be given to delivery of materials in specifying starting date. Bids must be accompanied by a Certified Check or Bid Bond in an amount equal to not less than five percent (5%) of the bid to be considered. No bid may be withdrawn after the scheduled closing time for receiving bids for a period of sixty (60) days. The Owner reserves the right to accept or reject in whole or in part any or all bids and to waive formalities and re-advertise. Doc Notes: Plans, specifications and contract documents are open to public inspection at the City of Cartersville Gas System offices located at 155 Old Mill Road, Cartersville, Georgia 30120. The Gas System offices may be contacted by telephone at 770.387.5642 or by mail at P.O. Box 1390, Cartersville, Georgia 30120. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.
Bid Results
Pipeline
$1,099,240.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.