BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 4, 2026 at 8:00 PM

Updated May 21, 2026

Demolition, site work and new construction of an industrial development in Auburn Univ, Alabama. Completed plans call for the demolition of a 15,108-square-foot industrial development.

The general scope of the work includes but is not limited to: relocation of existing feed bins, demolition of existing wood barn structure and installation of new concrete piers and metal building system. Construction also includes installation of owner provided cattle feeding system, contractor provided cattle railing panels, general concrete work as well as electrical, mechanical and plumbing work. Pre-qualification requirements: In accordance with Code of Alabama, 39-2-2(a), prequalification is required for this project. The prequalification application is available on the Auburn University Public Works Bid Calendar. For all questions or inquiries about this project, please contact: David Northcutt, northjd@auburn.edu; 334-752-2518 Work: Contractor’s Scope of Work includes: The sequential order of work shall be as follows: 1. Install all site protection work shown on Site Plan and specified here-in. 2. The temporary relocation of, the permanent relocation of, and the protection of the existing Silos during the extent of the construction and the construction of a temporary wooden shed, all of which shall remain in place and in service after the Silos have been relocated to the new slab (Item 1). The Contractor shall work around and protect the four relocated Silos and shall repair/replace any of the Silos damaged by Contractor’s forces during construction. The Contractor shall remove the temporary shed once he has relocated the feeding tubes to their permanent location. 3. The complete removal of all above slab wood framed construction. 4. The removal and replacement of perimeter portions of the existing Barn main slab and the existing slabs at the Storage Building and East Canopy to allow for new concrete slabs, concrete turndown slab extensions, footings, drilled piers and “caps”. 5. The construction of the new Metal Building to be constructed above existing and new concrete slabs, concrete drilled piers, and concrete footing caps all as illustrated on the structural drawings. 6. The installation of fifty (50) Calan Feeding Systems at Pens 1 through 5 under the Base Bid and ten (10) Calan Feeding Systems at Pen 6 if the Add Alternate is accepted. 7. Once the project is determined to be substantially complete, the removal of all site fencing, erosion control elements, and construction debris, and the rework of existing grades as necessary to align with existing grades and to provide a positive drainage away from the entire Barn perimeter in all directions, and as described here-in. RFI deadline prior to bid date - COB April 1, 2026

Bid Results

Industrial

$1,156,999.00

Public - State/Provincial

Demolition, New Construction, Site Work

22

17

33

5

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
68
Bidding Soon
996
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2026

May 12, 2026

Project location map

405 Shug Jordan Pkwy, Auburn Univ, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.