Site work for a water / sewer project in Monument, Colorado. Completed plans call for site work for a water / sewer project.

**As of May 4th, 2026, this project awarded to Gordon Company Inc. for $238,716.** The work includes all necessary labor, supervision, equipment, tools, and materials for the removal of downhole equipment from Well 12 and reinstallation in Well 12r, along with all associated piping, site work, and electrical. Close coordination between onsite contractors is required. The Contractor is responsible for coordinating execution schedules, equipment, and working spaces to avoid any delays. All project impacts and delays are the sole responsibility of the Contractor, with no additional costs incurred by the owner. Bids must be submitted on a lump sum basis as specified in the bid form. Bidders must include bid security as a cashier's check, certified check, or bidder's bond per the Instructions to Bidders. The successful bidder must furnish a performance bond and a labor and material payment bond. Bids cannot be withdrawn for 60 days after opening. The owner reserves the right to reject any or all bids and to waive any informalities or irregularities. Construction access to the site is available only via Muzzle Loader Way. Access across private property is strictly prohibited. Question Deadline 03/27/2026 All questions about the meaning or intent of the Contract Documents are to be submitted to Engineer Questions received less than 5 days prior to the date for opening of Bids will not be answered The District designates the following person, as its representative and Point-of-Contact for this RFP. Respondents shall restrict all contact with the District and direct all questions in writing regarding this RFP to the below Point-of-Contact person: Casey Johnston JVA, Incorporated 1675 Larimer Street, Suite 550 Denver, CO 80202 (720) 975-1423 cjohnston@jvajva.com

Award

Water / Sewer

$238,716.00

Public - City

Site Work

13

12

10

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
105
Bidding Soon
1,116
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2026

April 20, 2026

Project location map

Muzzle Loader Way, Monument, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.