BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 1, 2026 at 8:00 PM

Updated April 2, 2026

Site work and paving for a mixed-use development in Seaside, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

In general, the work consists of, but is not limited to, the demolition and construction of concrete curb, gutter, sidewalk, curb ramps, signage and striping, adjustment of utilities, concrete and hot mix asphalt pavement and all necessary storm water pollution protection and traffic control requirements. The intent of the project is to construct as many curb ramps as funding allows. The current project CDBG funding available for construction is estimated at $250,000, additional funding may be added. Unit and per each pricing from the bid schedule may be awarded in any quantity needed. Quantities shown in the bid schedule are for low bid comparison purposes only and do not represent the contract quantities. The project is located at various streets with the City of Seaside, Monterey County. CDBG Funded - Federal bidding requirement apply. Type of Award Lump Sum License Requirements Class "A" Liquidated Damages $3,200 Per Day Start/Delivery Date May 1st 2026 Project Duration 60 Calendar Days Question Deadline 03/20/2026 at 5:00 PM PT Online Q&A Yes

Bid Results

Sidewalks / Parking Lot

$432,283.00

Public - City

Paving, Site Work

19

19

6

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
4
Bidding Soon
727
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2026

April 29, 2026

Project location map

Multiple Locations, Seaside, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.