BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 20, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a civil project in Heber Springs, Arkansas. Completed plans call for site work for a water / sewer project.

The Mountain Top Public Water Authority is requesting bids for the construction of system upgrades and extensions, which include separate contracts for different scopes. Contract 1 consists of waterline extensions of approximately 43,375 feet of 12", 8", 6", 4" and 2" lines, new meter settings, tank vaults, valves, and related appurtenances for a complete project. Contract 2 involves the construction of a 500,000-gallon steel water storage tank and appurtenances for a complete project. Contract 3 involves the construction of a 200,000-gallon elevated steel water storage tank and appurtenances. Prospective bidders may obtain or examine the bidding documents at the issuing office during designated hours by paying a non-refundable deposit of $200 per set. The cost does not include shipping, which will depend on the delivery method chosen. For all further requirements related to bid submittal, qualifications, procedures, and contract award, refer to the instructions to bidders included in the bidding documents. All iron and steel products used in these projects must be produced in the United States as required by Section 746 of Title VII of the Consolidated Appropriations Act of 2017 and subsequent statutes mandating domestic preference. The following waivers apply to these contracts: De Minimis, Minor Components, Pig iron and direct reduced iron. Attendance at a pre-bid conference is encouraged but not required; contractors may request to meet the engineer at their convenience. Question Deadline 03/31/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing . Contact information and submittal procedures for such questions are as follows : A. Brock Engineering , Bobby J. Brock, P.E., (501 ) 250-1290, bobby.brock@suddenlink.net Questions received less than seven days prior to the date for opening of Bids may not be answered .

Bid Results

Water / Sewer

$861,303.00

Public - City

Site Work

17

13

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
31
Bidding Soon
543
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2026

June 15, 2026

Project location map

Multiple Locations, Heber Springs, AR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.