BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 22, 2026 at 8:00 PM

Updated July 28, 2026

Site work and renovation of a civil project in Heber Springs, Arkansas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Design, removal, installation, and testing of two digital static excitation systems, including power potential transformers for each system, at Greers Ferry Dam. The project results in a firm fixed-price construction contract with a magnitude between $1 million and $5 million. Work must be completed within 365 calendar days from notice to proceed. The requirement is set aside for small businesses under NAICS code 335312, with proposals evaluated using a Best Value Trade-Off method. Contractors and subcontractors must ensure their information systems comply with CMMC Level 1 (Self) requirements for processing, storing, or transmitting Federal Contract Information (FCI) or Controlled Unclassified Information (CUI). Site Visit: An organized site visit has been scheduled for 23 July 2026 at 10:00 AM CDT. Participants will meet at, 700 Heber Springs Rd North, Heber Springs, AR 72543 Bidder Inquiry: A Request for Information (RFI) review has been set up at www.projnet.org for this solicitation. The inquiry key is 8W6UN5-B749WE. The RFI submission period is open from 15 July 2026 through 13 August 2026. A Request for Information (RFI) submit to online The Magnitude of Construction is between $1M and $5M. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

$5,000,000.00

Public - Federal

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
27
Bidding Soon
491
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2026

October 27, 2026

Project location map

700 Heber Springs Rd N, Heber Springs, AR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.