BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 15, 2026 at 8:00 PM

Updated May 20, 2026

Demolition, site work, paving and new construction of a civil project in Ross, Ohio. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Project Description: This project will provide for the complete replacement of the bridge that carries West Junction Rd. over the Ohio South Central Railroad. The project also includes minor roadway work on Raysville Rd. and West Junction Rd. Question deadline added as per Adda 1. Questions deadline April 8 4:00 PM Questions up until that time still must be submitted through Online This is a bridge replacement project involving steel construction work. May require Ohio prevailing wage compliance, workers' compensation coverage, and drug-free workplace program enrollment. Project Description: This project consists of the replacement of the existing 3-span steel beam bridge with metal decking and asphalt concrete wearing course, supported on reinforced concrete substructure; with a single span prestressed concrete box beam bridge with composite reinforce concrete deck, supported on reinforce concrete semiintegral abutments with MSE walls. The proposed work shall also include approach roadway work and new approach guardrail. DBE Goal: 0% Engineer's Estimate (if made public): Detailed Location Information: Structure located on CR213B (West Junction Road) 0.13 miles NW of the Ross/Vinton County Line over the Ohio South Central Railroad Summary of other pertinent details: The new structure will be a single span prestressed concrete box beam bridge with composite reinforced concrete deck supported on semi-integral abutments with MSE walls. A preconstruction meeting will be held within 10 days of the award date. The contract completion date is November 21,2026. The Board of county Commissioners reserves the right to reject any and all bids.

Post-Bid

Bridges / Tunnels

$1,000,000.00

Public - County

Demolition, New Construction, Paving, Site Work

42

10

8

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
268
Active Projects
153
Bidding Soon
2,500
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2026

June 15, 2026

Project location map

Multiple Locations, Ross, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.