BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 15, 2026

Renovation of a municipal facility in West Jordan, Utah. Completed plans call for the renovation of a municipal facility.

The South Valley Water Reclamation Facility requests proposals from the list of approved vendors for the work described in the RFP to support the upcoming MCC Replacement Project. Firms qualified and interested in responding to the RFP should review the schedule & requirements in the RFP. Question Deadline 04/17/2026 at 6:00 PM MT Questions through Online Portal Individual Approved Integrator Site Tours (Monday 3/16/2026 3/27/2026 Thursday between 8:00 AM and 4:00 PM) PROJECT SCOPE The minimum recommended scope of work shall include the following. Integrators may, at their option, make suggestions to modify the scope of work. 1. Programming services: a. Modify existing written control strategies for all PLC programming for process and mechanical equipment powered from new MCCs. i. Hold a minimum of two control strategy coordination workshops with the Owner to review and define all new and modified PLC programming. ii. Coordinate with the Owner and MCC Manufacturer to provide comprehensive list of Modbus/TCP data to be transmitted between MCCs and PLCs. b. Provide all PLC programming services required for the implementation of the installation of new MCCs. PLC programming will adhere to the written control strategies. i. Modify existing PLC control logic programming to change from hard-wired input/output (I/O) motor control to Modbus/TCP data network control with new MCCs ii. Re-map I/O signals and PLC register data as needed. 1. The MCC replacement scope includes some new smart starters for equipment that is not currently monitored by the plant iFIX Human Machine Interface (HMI) system. Provide re-mapping of PLC register data for those items to allow the Owner to monitor in the HMI system. iii. Reuse existing PLC control logic wherever possible. iv. At a minimum, modify PLC programs for the following

Bid Results

Municipal

$3,182,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2026

May 27, 2026

Project location map

To Be Determined, West Jordan, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.