BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 17, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a civil project in Meridian, Idaho. Completed plans call for site work for a bridge / tunnel; and road / highway.

The project consists of widening Linder Road from Overland Road to Franklin Road to five lanes, including a new four-lane bridge over I-84. The work includes new curb gutter and 10' buffered multi-use pathways, replacement of the Ten Mile Creek Bridge, stormwater improvements, irrigation pipe replacements, and two Pedestrian Hybrid Beacons. All work involving irrigation and/or bridge work shall be completed no later than March 15, 2027, unless otherwise approved by the irrigation district. All other work shall be completed in its entirety on or before November 5, 2027. The contractor shall be liable for any and all damage charges filed as a result of disruption of irrigation water delivery. Liquidated Damages of $5,000 per calendar day of delay will be assessed. A delay on one portion of the project does not justify delays on other portions of the project. Liquidated damage assessments shall be cumulative and concurrent. Question Deadline date changed from 04/03/2026 to 04/10/2026 as per Addendum 1 Questions Response Deadline Change Updated Addendum Deadline: April 13th 2026at 4:30 pm

Award

Bridges / Tunnels

$30,000,000.00

Public - County

Paving, Site Work

192

22

37

4

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
24
Bidding Soon
381
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2026

June 1, 2026

Project location map

S Linder Rd, Meridian, ID

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.