BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 19, 2026

Site work for a water / sewer project in Lake Elsinore, California. Completed plans call for site work for a water / sewer project.

Scope of Services: Please review the RFP and attachments. Instructions to bidders: Review Section 4.10 of the RFP for license requirements. Attendance at a pre-bid meeting is required. Submit responses electronically by the bid due date. Bid, payment, and performance bonds are specified. Online Q&A is available until the stated deadline. Question Deadline 06/10/2026 at 2:00 PM PT Deadline for submitting questions via Online Q&A system. The total design-build project cost is estimated to be between $95 million and $115 million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The District's primary objectives for this Project are as follows: o Upgrade/improve the existing CLWTP. o Accommodate a treatment capacity range of 1.5 mgd to 7.0 mgd. o Harness the benefits of the DB approach to achieve a high-quality, innovative, costeffective solution based on collaboration with the DB Entity. o Comply with all permitting requirements. o Validate the findings and recommendations related to the PFAS treatment basis of design specified for GAC and IX vessels as summarized in the PFAS Pilot-Scale Testing Report. o Achieve the specified completion dates for design, construction and performance testing of the Project. o Optimize operations and maintenance requirements so that the CLWTP is capable of reliably and continuously operating in a cost-effective manner over the long-term. o Provide for DB Entity assumption of single point of accountability for performance of all services under the DB Contract. o Provide for coordinated design development with District input in a manner that preserves DB Entity's sole responsibility for the achievement of Project performance objectives while meeting District objectives associated with schedule, cost, quality, aesthetics, treatment objectives, and long-term operability.

GC Bidding

Water / Sewer

$115,000,000.00

Public - County

Site Work

11

19

2

6

Subscribe For Documents

72 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
726
Active Projects
370
Bidding Soon
4,608
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2026

February 1, 2027

Project location map

Multiple Locations, Lake Elsinore, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.