BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 1, 2026 at 8:00 PM

Updated April 2, 2026

This is a service / maintenance or supply contract in Polk City, Iowa. Contact the soliciting agency for additional information.

The contractor is required to supply and install the necessary components to restore the Schneider Electric Variable Frequency Drive (VFD) at the Big Creek Supplemental Pump Station to full operational status. The work includes procurement, supply, on-site installation, configuration, testing, and commissioning of the repaired VFD to ensure it meets or exceeds original performance specifications. Only Schneider Electric parts and certified technicians must be used. The contract will be awarded to the offerer with the lowest evaluated price who meets the scope of work requirements.

Award

Water / Sewer

$44,208.00

Public - Federal

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
0
Bidding Soon
464
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2026

May 6, 2026

Project location map

To Be Determined, Polk City, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.