Published April 28, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a road / highway in Ridgeway, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of April 28, 2026 project was awarded to G-­Pro Excavating and Landscaping, awarded amount is $142,822.50. The Project consists of storm sewer systems’ replacement and street reconstruction on Kirby Street. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, with additive alternate bid items as indicated in the Bid Form. The letting of the work described herein is subject to the provisions of Sections 61.54, 62.15, 66.0901, and 66.0903(1m) of the Wisconsin Statutes. There are no prevailing wage rates for this Project. The Kirby Street portion of the Project is funded in part by Local Road Improvement Program (LRIP) Funds from the Wisconsin Department of Transportation. The street components of the Kirby Street portion of the Project funded with LRIP funds will not be funded with any other state federal funds. The Village of Ridgeway encourages Minority-owned Business Enterprises (MBE’s), Women’s Business Enterprises (WBE’s), Disadvantaged Business Enterprises (DBE’s), and Small Businesses in Rural Areas (SBRA’s) to submit bids. A municipality, in awarding prime contracts, and primary contractor, in awarding subcontractors, are required to make a good faith effort to achieve a combined minimum goal of participation for MBE WBE utilization in accordance with s.NR 162.09(3), Wis. Admin. Code. If a subcontractor awards subcontracts, these requirements shall apply to the subcontractor. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least five percent (5%) of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the Bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the Bidder as soon as the contract is signed. If after 15 days the Bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. Online BIDDER is required to deliver the original certified check, bank money order, or bid bond within 72 hours of bid opening to Delta 3 Engineering, Inc. Bids may not be withdrawn within 90 days after the date of the bid opening. The OWNER reserves the right to increase or decrease the quantity of any item or portion of the work, or to omit portions of the work, as may be deemed necessary by the OWNER, and the same shall in no way affect or make void the contract, except that additions to, or deductions from, the contract price will be appropriately made. The OWNER reserves the right to waive any informalities, or to reject any or all bids, or any part of a bid, and to award the Contract to the Bidder, who in the judgment of the OWNER, will best serve the interest of the OWNER. Written inquiries shall be mailed or hand delivered to Mark Doyle, Delta 3 Engineering, Inc., 875 S. Chestnut Street, Platteville, Wisconsin, 53818. B. Electronic inquiries shall be emailed to the following email address: doylem@delta3eng.biz with the subject line "Proposed 2026 Street Reconstruction - Kirby Street".Question Deadline 03/24/2026

Award

Roads / Highways

$142,823.00

Public - City

Paving, Site Work

14

10

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
226
Active Projects
121
Bidding Soon
1,817
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2026

April 27, 2026

Project location map

Kirby St, Ridgeway, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.