BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 14, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Egan, South Dakota. Completed plans call for site work for a water / sewer project.

The work includes construction of approximately 12,725 linear feet of 16-inch diameter watermain, 6,000 linear feet of 12-inch diameter watermain, 4,400 linear feet of 10-inch diameter watermain, 13,900 linear feet of 8-inch diameter watermain, and 5,280 linear feet of 3-inch diameter watermain. Water main construction consists of PVC water main installed by open excavation and horizontal directional drilling methods, ductile iron fittings and restraints, highway crossings with jack & bored casing pipe, isolation gate valves, manual air release valves, sacrificial corrosion protection system, tracer wire, erosion control, seeding and restoration, pressure testing and disinfection, cleanup, startup services, and all other miscellaneous work required not herein mentioned but inferred from the Contract Documents. All bids must be accompanied by a bid security, either as a bid bond in an amount of 10% of the bidder's maximum bid price or a cashier's/certified check made payable to Owner in an amount of 5% of the bidder's maximum bid price. The successful bidder must furnish construction performance and payment bonds, each in the amount of 100% of the contract award. The project requires compliance with American Iron and Steel (AIS), Telecommunications Clause per Public Law 115-232, Section 889, Equal Employment Opportunity, Affirmative Action Requirements, and Davis Bacon Requirements. Disadvantaged/Minority Business Enterprises goal is 1.5%, and Women's Business Enterprise goal is 2.4%. Bidders must comply with Equal Employment Opportunity regulations and various Civil Rights laws. For additional instructions on bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders included in the Bidding Documents.

Post-Bid

Water / Sewer

$7,000,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
45
Bidding Soon
544
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2026

May 23, 2026

Project location map

23343 479th Ave, Egan, SD

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.