BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 16, 2026

Site work and paving for a mixed-use development in Reno, Nevada. Completed plans call for site work for a educational facility; educational facility; and for paving for a educational facility.

Replacement of asphalt pavement which includes subgrade modifications and striping, as indicated on the drawings at Florence Drake Elementary School, Kathrine Dunn Elementary School, Hidden Valley Elementary School, Incline High School, and Verdi Elementary School. Question Deadline: Tue 04/07/2026 4:30 PM* The intent is to award each school individually. See Bid Form (PUR-F523) for additional information. It is WCSD's opinion that the scope of work for this project qualifies for the following license groups: General Engineering A OR General Contracting AB. If a contractor would like to seek clarification from the Nevada State Contractors Board, then they must do so ten (10) days prior to the bid due date. Verdi Elementary School Low $116,640.00 High $142,560.00 Force Account $19,400.00 Incline High school Low $980,600.00 High $1,198,510.00 Force Account $163,400.00 Hidden Valley Elementary School Low $243,465.00 High $297,565.00 Force Account $40,575.00 Katherine Dunn Elementary School Low $410,415.00 High $501,620.00 Force Account $68,400.00 Florence Drake Elementary School Low $228,435.00 High $279,200.00 Force Account $38,000.00 Estimated Project Cost: Engineer's Estimate Range: $1,979,552 to $2,419,452 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PWP #s: Florence Drake Elementary School - WA-2026-293 Katherine Dunn Elementary School - WA-2026-294 Hidden Valley Elementary School - WA-2026-295 Incline High School - WA-2026-296 Verdi Elementary School - WA-2026-297 Bid result Florence Drake Elementary School – F.W. Carson Co. – $179,182.00 Katherine Dunn Elementary School – Sierra Nevada Construction, Inc. – $343,400.00 Hidden Valley Elementary School – Sierra Nevada Construction, Inc. – $181,575.00 Incline High School – Sierra Nevada Construction, Inc. – $737,400.00 Verdi Elementary School – F.W. Carson Co. – $137,028.00

Award

Educational

$1,578,585.00

Public - County

Paving, Site Work

31

34

36

10

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2026

June 11, 2026

Project location map

Multiple Locations, Reno, NV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.