Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 15, 2026 at 8:00 PM
Updated May 16, 2026
Site work and new construction of a mixed-use development in Carson, California. Completed plans call for the construction of a 8,000-square-foot theater / auditorium; 8,000-square-foot museum; 8,000-square-foot conference / convention center; 8,000-square-foot office development; and for site work for a conference / convention center.
THIS IS STRICTLY AN ADVERTISEMENT, FOR PROJECT DOCUMENTS VISIT CSUBUY. COLLABORATIVE DESIGN-BUILD SERVICES "Modified Collaborative Design-Build with Owner-Appointed Architect of Record" DYMALLY INSTITUTE BUILDING PROJECT California State University, Dominguez Hills 1000 E. Victoria St Carson, CA 90747 The State of California, acting through the Board of Trustees of The California State University, hereinafter called Trustees or BOT, on behalf of California State University, Dominguez Hills, hereinafter called University, is seeking proposals from Design-Builders (Proposers) to provide pre-construction and construction services for the project referenced above (Project). This is not a traditional Collaborative Design Build Selection process in which the University will select a Design-Build Team. Instead, the University will select a general contractor based on qualifications and proposed fees, who will partner with the University's pre-selected architect of record (AOR). The delivery method for this Project is a modified form of the Trustees' Design-Build delivery method, called Collaborative Design-Build. This is a two-phased project delivery process: Phase 1-Design and Preconstruction Services, hereinafter referred to as Phase 1, and Phase 2-Design-Build Construction Services, hereinafter referred to as Phase 2. There will be a separate agreement for each phase. The Project consists of: New Construction of 8000 SF CMU Building for the Marvyn M. Dymally African American Political & Economic Institute (MDAAPEI), located adjacent to the northeast of the CSUDH College of Continuing & Professional Education (CCPE) and the Orthotics and Prosthetics (O&P) buildings. The new Dymally Institute includes gallery, offices, conference room, auditorium, courtyard, and various support spaces. RFP Submittal Due Date and Time: April 23, 2026, 2:00 pm Budgeted Direct Construction Cost: $11,000,000.00 Contractor License Requirement: B RFP re-Proposal Conference to be held on March 31, 2026 at 10:00 am CSU Point of Contact for Information: Maria Hernandez, mehernandez@csudh.edu, 310-243-3799 Question Submission Close Date 4/15/2026 5:00 PM PDT
Post-Bid
Museum
$11,000,000.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 15, 2026
July 14, 2026
1000 E Victoria St, Carson, CA
Related To This Project
Carson, CA
Bid Date: Apr 02 2026
Carson, CA
Bid Date: May 18 2026
Carson, CA
Bid Date: May 15 2026
Carson, CA
Bid Date: May 26 2026
Carson, CA
Bid Date: May 21 2026
Carson, CA
Bid Date: Apr 23 2026
Carson, CA
Bid Date: Mar 12 2026
Construction of Andrew Carnegie Middle School - Revised Carnegie MS HVAC Replacement (PSA) - 6051707
Carson, CA
Bid Date: Mar 17 2026
Carson, CA
Bid Date: Mar 12 2026
Carson, CA
Bid Date: Feb 26 2026
Carson, CA
Bid Date: Mar 19 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
