BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 20, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a water / sewer project in Park Forest, Illinois. Completed plans call for site work for a water / sewer project.

All mobilization, excavation, material, labor, equipment and incidentals necessary to install approximately 11,104 linear feet of 8-inch to 12-inch Sanitary Sewer Cured in Place Liner (CIPP) and the traffic control needed to complete the project. Proposals must be submitted on the forms provided and must be accompanied by a bid bond, cash, or certified check made payable to the Village in the amount of not less than 5 percent of the total amount of the proposal as a guarantee that if the proposal is accepted a contract will be entered into and the performance of the contract is properly secured. No bid shall be withdrawn after the opening of the proposals without the consent of the Mayor and the Board of Trustees for a period of 30 days after the scheduled time of closing bids. Each bidder is required to comply with Equal Employment Opportunity for the Community Development Block Grants. Each bidder is required to be registered in the Federal Government databank for contractors at SAM.gov and have an active Unique Entity Identifier (UEI) number in the system. Each bidder is required to comply with the Build America, Buy America Act. Compliance with "Section 3", which calls for affirmative action by the Contractor to train and/or hire lower income residents of the Project area and to subcontract with local, small businesses is required on this Project. The successful bidder will be required to file a performance bond equal to one hundred percent of the bid, with sureties to be approved by the Mayor and the Board of Trustees, conditioned upon proper and faithful performance by the Contractor. The Contractor shall be required to furnish sufficient insurance or guaranty of indemnity to the Village and the County of Cook against any or all claims which might arise for damages to persons or property due to the negligence of the Contractor or Subcontractor(s), or their officers, agents, employees or servants, during the construction and until the improvement has been finally accepted as complete by the Mayor and the Board of Trustees. The right to reject any and all proposals or bids is reserved. Question Deadline 04/07/2026 Any questions regarding this project shall be submitted in writing or by email to Nicholas Christie, Assistant Director of Public Works, Village of Park Forest, 350 Victory Drive, Park Forest, IL 60466, nchristie@vopf.com.

Award

Water / Sewer

$389,100.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2026

June 8, 2026

Project location map

Multiple Locations, Park Forest, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.