BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 22, 2026 at 8:00 PM

Updated May 21, 2026

Demolition, site work and new construction of a transportation facility in Van Wert, Ohio. Completed plans call for the demolition of a transportation facility.

Work consists of the reconstruction of the windcone project at the Van Wert County Regional Airport, including removal of the existing windcone and installation of a new windcone at a new location, along with necessary incidentals to complete the work as detailed in the contract drawings and documents. The contractor must provide all labor, equipment, and material required to complete the project. Instructions to bidders include: - Bids must be properly executed and addressed to the specified location, together with all required bid forms, specifications, and legal documents. - Bidders must be plan holders of record, having obtained contract documents through the engineer’s office. - A bid bond or certified check equal to ten percent (10%) of the total bid is required. - Performance and payment bonds, each for 100 percent of the contract price, will be required. - Each bid must include the bidder’s financial statement, statement of experience, proposed plan(s) for performing the work, and available equipment. - Wage rates must comply with the most recent Wage Rate Decision of the Secretary of the U.S. Department of Labor. - The Owner reserves the right to waive informalities, reject any or all bids, and to award the contract to the bidder most advantageous to the Owner. - No bids may be withdrawn for sixty (60) days after the bid deadline. - The project is subject to federal equal opportunity and nondiscrimination requirements. - Disadvantaged Business Enterprises will be afforded full opportunity to submit bids and will not be discriminated against based on race, color, sex, or national origin. nterpretation of Documents: If any person contemplating submitting a proposal is in doubt as to the true meaning of any part of the drawings, specifications, or other Contract Documents, or finds discrepancies in or omissions from the drawings or specifications, he may submit to the Engineer a written request for interpretation or correction thereof. The person submitting the request will be responsible for its prompt delivery. Any interpretation or correction of the Documents will be made only by addendum duly issued and a copy of the addendum will be mailed or delivered to each person receiving a set of Contract Documents. Neither the Owner nor the Engineer will be responsible for any other explanations or interpretations of the contract documents.

Bid Results

Transportation Terminals

$63,435.00

Public - County

Demolition, New Construction, Site Work

8

10

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2026

May 14, 2026

Project location map

901 Elks Dr, Van Wert, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.