BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 9, 2026 at 8:00 PM

Updated May 20, 2026

Site work, paving and new construction of a playground / park / athletic field in Lehi, Utah. Completed plans call civil work for a playground / park / athletic field.

Lakeview Park is a 9-acre community park, surrounded by city open space in the Traverse Mountain area. This park will feature a playground, grass fields, landscaping and trees, pavilions, basketball and pickleball, a parking lot, restrooms, etc. Lakeview Park is located up neighborhood roads at 4675 N Autumn View Dr, Lehi, UT 84043. 2.3 SCOPE OF WORK o Grade site to elevations shown on plans. o Construct new asphalt trails, parking lot, concrete sidewalks and stairs, fencing, and ADA ramps per plans. o Construct post-tensioned sports courts. o Install irrigation system per plans and to current Lehi City standards and details. o Install trees, shrubs, plants, sod, mulch, etc. as shown on landscape plans and per current Lehi City standards and details. o Connect all utilities to restroom/storage facility, per Lakeview Park plans and restroom specifications. o Install electrical and site lighting per plans. o Provide pergola engineer plans and construct to match concept. o Coordinate timing of playground and safety surfacing installation with playground contractor, hired by the city. Construct all curbing and drainage, and bring the playground area to grade, per plans, in preparation for the playground contractor. o Coordinate installation of pavilion structures, provided by the city; install all electrical to the pavilion as shown on the plans. Footings and concrete slab furnished by the contractor. o Import top soil Initial minimum 30-day maintenance period during sod establishment which extends until substantial completion is approved (mowing/trimming and keeping beds weedfree). Provide site furnishings per plans: picnic tables, trash cans, bike rack, benches, sign. NOT INCLUDED The playground and play surfacing will be installed by a separate vendor (Sonntag Recreation), but coordination will be needed with the general contractor on timing. The concrete surround and sub-surface are to be prepared/constructed by the contractor, per plans. Pavilion construction. Contractor shall install concrete pad after pavilion is complete. The restroom will be a prefabricated building, paid for by Lehi, delivered & placed by the supplier, with preliminary and final utility connections by the contractor. Questions Due Date: Apr 1st 2026, 5:00 PM MDTQuestions regarding this RFP should be submitted through Bonfire. The respondent may also contact Project Contact (listed above) for specific questions regarding the proposal content. The bid number and title must be referenced on all responses and correspondence related to the RFP. All questions should be received two (2) business days prior to the RFP due date. Trent Dyer 385-201-2714 tdyer@lehi-ut.gov

Post-Bid

Playgrounds / Parks / Athletic Fields

$9,000,000.00

Public - City

New Construction, Paving, Site Work

113

32

2

3

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
99
Bidding Soon
1,298
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2026

June 8, 2026

Project location map

4675 N Autumn Vw Dr, Lehi, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.