BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 26, 2026 at 8:00 PM

Updated March 27, 2026

Renovation of a mixed-use development in Jacksonville, North Carolina. Completed plans call for the renovation of a educational facility.

Reference Number 0000417194 Source ID PU.AG.USA.1157245.C20082026 Piggyback Contract No Bid Intent Not Available Questions are submitted online The purpose of this bid is to reroof the Locker Room/ Gym and Admin Reroof at White Oak High School. It is the intent of this proposal invitation to obtain contract proposals to reroof locker Room/ Gym and Admin Building at White Oak High School located at 1001 Piney Green Rd, Jacksonville, NC 28546. All products and/or services rendered by the vendor must meet all requirements of this invitation and be completely satisfactory to using agencies. Removal of existing EPDM single ply membrane, existing metal trim down to existing insulation and fiberboard (if any) and the recovering of roof with new 1/2 " gypsum core boards with fiberglass facer mat (Dens Deck Prime Roof boards by Georgia Pacific, or equivalent and a new 60 mil, reinforced, smooth white, fully adhered TPO membrane roofing system with 20-year NDL manufacturer's warranty. Contractor is responsible for the legal disposal of all debris. The existing insulation and roof deck shall remain in place. All skylights and unused curbs are to be removed and filled in with metal or 3/4" plywood. Roof areas are sloped, any areas found to pond water or where 1/8" per foot minimum roof slope does not exist shall be provided by crickets or tapered insulation for positive drainage. All areas shall receive % 1/2 " thickness gypsum core board over existing insulation. Remove and remount any HVAC Equipment as needed to complete new roofing installation. When roof is completed the Contractor shall reinstall, reconnect, reposition any roof mounted equipment, fans, HVAC units, electrical wires, lights, ground wires, devices and other items removed during the roofing installation. Where there are existing roof drains they are to remain, provide new bolts in the clamping, compression rings. Where the clamping, compression rings are damaged or broken, provide new cast iron clamping, compression rings with new cast iron domes. Plastic domes and retrofit-type drains are unacceptable. Completion- 5/6/2027

Sub-Bidding

Educational

$100,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
1
Bidding Soon
616
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2026

June 5, 2026

Project location map

1001 Piney Green Rd, Jacksonville, NC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.