BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 4, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a mixed-use development in Anaheim, California. Completed plans call for site work for a educational facility; and day care center.

This project includes but is not limited to repairing and replacing asphalt in the playground, walkways, and parking lot at Anaheim Hills, Canyon Rim & La Veta Elementary Schools, California iInspire Academy, Richland High School, and Parkside Child Development Center. See Prequalification requirements in Notice Inviting Formal Bids and Supplementary & Special Conditions. Online Q&A Online Q&A Yes Q&A Deadline 04/22/2026 4:00 PM (PDT) Start/Delivery Date 60 Consecutive Calendar Days Award of Contract by Board of Education 05/21/2026 QUESTIONS REGARDING THIS NOTICE: Email Bids@OrangeUSD.org or call 714-628-4440 Locations-Anaheim Hills Elementary School, 6450 E. Serrano Ave., Anaheim, CA 92807 The Project Scope of Work includes the following: (a) Contractor responsible for: Playground (Yellow highlight) 1) Remove the existing asphalt in the specified area to a depth of 3" and haul away to an offsite location. 2) Remove existing damaged asphaltic concrete and sub-grade to a depth of 3" on the playground and haul away to an offsite location. 3) Fine grade, roll, and compact the grade prior to the asphalt installation. 4) Furnish and install 3" asphaltic concrete to the playground, roll and compact. 5) Furnish and install redwood headers as needed. 6) Re-stripe the playgrounds per the existing layouts. (b) Contractor responsible for: Kinder Area (Blue highlight) 1) Remove 7" of soil and prep the area. 2) Install 4" of base and compact to 95 percent. 3) Furnish and install 3" asphaltic concrete to the Kinder area, roll and compact. 4) Furnish and install redwood headers as needed. 5) Kinder area square feet is 49" x 38" Canyon Rim Elementary School, 1090 The Highlands Dr., Anaheim, CA 92808 (a) Contractor responsible for: 1) Remove the existing asphalt in the lunch shelter area to a depth of 3" and haul away to an offsite location. 2) Remove existing damaged asphaltic concrete to a depth of 3" on the playground and haul away to an offsite location. 3) Fine grade, roll, and compact the grade prior to the asphalt installation. 4) Furnish and install 3" asphaltic concrete to the playground, roll and compact. 5) Furnish and install 3" asphaltic concrete to the lunch shelter area, roll and compact. 6) Furnish and install redwood headers as needed. 7) Re-stripe the playgrounds per the existing layouts. 8) Sub-grade to be accepted at +/- a tenth (0.10) to balance. Richland Continuation High School, 615 N. Lemon St., Orange 92867 (a) Contractor Responsible for: 1) Remove existing damaged asphaltic concrete and sub-grade to a depth of 4" on the parking lots and haul away to an offsite location 2) Fine grade, roll and compact the grade prior to asphalt installation. 3) Furnish and install 4" asphaltic concrete roll and compact. 4) Furnish and install redwood headers as needed. 5) Re-stripe the parking lot per the existing layouts. 6) Sub-grade to be accepted at +/- a tenth (0.10) to balance.

Bid Results

Educational

$1,393,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2026

June 15, 2026

Project location map

Multiple Locations, Anaheim, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.