BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2026 at 8:00 PM

Updated May 15, 2026

Site work for a religious / funeral development in San Antonio, Texas. Completed plans call for site work for a religious / funeral development.

Upright headstone raising and realigning, upright headstone cleaning, and turf renovation or replacement, including all labor, materials, and equipment required to complete the National Shrine Project. Work includes a base bid with two bid options and will be procured as an invitation for bid under a total SDVOSB set-aside. Project Location: Fort Sam Houston National Cemetery, 1520 Harry Wurzbach Rd, San Antonio, TX 78209 The construction magnitude for this requirement is between $2,000,000 and $5,000,000. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. . The Contractor shall raise/lower, realign, reset, backfill, and clean upright headstones at the Cemetery in a manner that will meet or exceed the requirements to present a clean, neat, professional, and aesthetic headstone appearance and in accordance with Contract Specifications. Services include, but are not limited to work consisting of extracting, resetting, surveying, aligning, backfilling, compacting, and cleaning of upright headstones, as well as inventorying and ensuring accurate placement on each gravesite. ii. The Contractor shall remove and restore Cemetery turfgrass, which includes, but is not limited to: killing and removing existing turfgrass, rototilling the existing topsoil, adding or removing topsoil to establish a new finish grade, installing new turfgrass sod, and establishing new turfgrass sod, preservation of existing cemetery features (lawns, paving, roads, stones and markers). iii. The Contractor shall restore cemetery features disturbed or removed as a result of performing new work, as well as, repair, replace, or reinstall any damaged cemetery property, such that at the end of the day the condition is as good as before commencement of work. Scheduling of services shall be coordinated with the Contracting Officer's Representative (COR) to avoid disruption of ongoing cemetery operations. Question Deadline 04/28/2026 at 3:00 PM CT Questions shall be submitted only via email to: daniel.kinney@va.gov.

Post-Bid

Religious / Funeral

$5,000,000.00

Public - Federal

Site Work

3

13

2

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2026

July 13, 2026

Project location map

1520 Harry Wurzbach Rd, San Antonio, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.