BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 14, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Geneva, New York. Completed plans call for site work for a water / sewer project.

Question Deadline 04/03/2026 Every request for such interpretation must be addressed to Joe Venuti, City of Geneva, Director of Public Works at: jvenuti@cityyofgenevany.gov and to be given consideration must be received at the above address at least six (6) days prior to the date fixed for the opening of bids. The project location is: 37 Lakefront Drive, City of Geneva. Minority / Women Business Enterprise contracting goals (MWBE) MBE Goal: 15.00% WBE Goal: 15.00% This project generally consists of demolition and removal of marina structures, installation of a replacement floating dock system, and repair of the existing rubble-mound breakwater. Bidders must obtain bidding documents through the specified plan room to be considered a Plan Holder of record. A non-refundable fee is required for electronic download, CD, or printed copies of the documents, with additional shipping and handling costs as applicable. Each bidder must submit a security deposit not less than five percent (5%) of the bid amount, in the prescribed form and subject to set conditions. If the successful bidder fails to enter into contract as required, the deposit will be forfeited as liquidated damages. No bids may be withdrawn within sixty (60) days after the opening date, but may be withdrawn before the receipt deadline. All materials incorporated into the project should exclude sales and compensating use taxes. All contract work must comply with applicable ordinances, regulations, laws, and State of New York Department of Labor rules. The right is reserved to waive informality, reject any or all bids, or make an award to other than the low bidder. Disadvantaged, Minority, Women, and Service-Disabled Veteran-Owned Business Enterprises are strongly encouraged to participate. MWBE contracting goals are 15% MBE and 15% WBE.

Bid Results

Water / Sewer

$1,605,310.00

Public - City

Site Work

11

15

2

6

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2026

June 8, 2026

Project location map

37 Lake Front Dr, Geneva, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.