Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 28, 2026 at 8:00 PM
Updated May 20, 2026
Site work and new construction of a water / sewer project in Snyder, Oklahoma. Completed plans call for site work for a water / sewer project; and for the construction of a water / sewer project.
The work consists of Water System Improvements including: construction of an Office/Lab CMU Building and Foundation, Liquid Ammonium Sulfate Building and Foundation, Liquid Ammonium Sulfate System, Sodium Chlorite Building and Foundation, Sodium Chlorite and Chlorine Dioxide System, Chlorine Gas/Chlorine Dioxide CMU Building and Foundation, Chlorine Gas System, Chemical Feed Piping, Electrical Building and Foundation, 50 Gpm Side Stream Pump Station, Static Mixer Vaults in various sizes, Flow Meters and Vaults, Clearwell Hatch Modifications, installation of 12", 10", and 6" PVC C900 DR-18 Water Mains, 12" and 6" Gate Valves & Boxes, various Bends and Reducers, SCADA and Telemetry, Lift Station and Force Main, RPZ Backflow Preventer and Enclosure, Site Demolition, Bollards, Interconnections, Gravel Drive, Electrical System Improvements, 30'-Wide Gate, Sawcut Pavement, Filter Improvements, SCADA for Filters, Bypass and Plant Operational Continuity During Construction, Hydrostatic Pressure Testing and Disinfection, Erosion Control, Remote Read Meters and Meter Installation of various sizes, and Drive By System. All work and materials must comply with the provided Plans and Specifications. Each bidder must accompany their bid with a certified or Cashier's Check or Bidder's Bond for 5% of the bid amount, a DW-412 Non-collusion Affidavit, and a DW-413 Business Relationships Affidavit. Performance, Maintenance, and Statutory Payment Bonds for 100% of the contract price from a Corporate Surety licensed in Oklahoma are required. A Maintenance Bond for one year after acceptance of work is also required. Bidders must comply with Equal Opportunity Employment, Department of Environmental Quality Small, Minority, Women's Businesses Requirements, Anti-Kickback Act, Contract Work Hours Standards Act, Davis Bacon Act wage rules, and American Iron and Steel provisions. Registration in the System for Award Management (SAM) is required. Only bids received on time and in accordance with the instructions will be considered. The contract will be awarded to the lowest responsive, responsible bidder, with the Owner reserving the right to waive informalities and reject any or all bids. Conditional bids will not be accepted. Question Deadline 04/13/2026 at 11:59 AM CT
Bid Results
Water / Sewer
$3,813,935.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
