Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 13, 2026 at 8:00 PM
Updated May 20, 2026
Site work for a playground / park / athletic field in Mt Sterling, Illinois. Completed plans call for site work for a playground / park / athletic field.
**As of May 08, 2026, the project was awarded to Martin & Company, with an awarded amount of $1,273,605.70.** Construct a 10 foot wide multi-use path approximately 1.9 miles long. Work will include earth excavation, construction of pavements, pipe culverts, cast-in-place concrete box culvert, precast concrete box culvert, concrete gutters, concrete sidewalk, concrete median surface, HMA paving, erosion control, pavement marking, signage, and related items. Project begins on new alignment near the intersection of 43rd and 45th Avenue in the City of Sterling, Illinois. Plans and proposal forms shall be obtained electronically in PDF format from the Willett, Hofmann & Associates, Inc. website at www.willetthofmann.com. Contractors shall click on "Bid Login" on the homepage of the website and follow the instructions. The Project Manual PDF can be downloaded from the website by depositing a non-refundable twenty-two dollars ($22.00) by credit card. All work shall be completed in accordance with the terms and conditions of the ordinances of Sterling Park District and Palmyra Township, including all specifications and regulations they refer to. The Contractor shall be familiar with the site locations, methodology of this work and standard construction procedures and practices prior to bidding. The location and elevations as shown on the plans may vary slightly during construction due to existing field conditions not readily apparent until the time of construction. The Engineer does not warrant or guarantee the correctness of the location of existing utility lines and site features as furnished by others. It shall be the contractor's responsibility to verify the correctness of the utilities and features prior to the start of construction by uncovering underground utilities in all locations where he feels the proposed construction may need to be altered to prevent conflicts in line, grade or working clearances. Changes in quantities approved by the Engineer shall be paid at the unit price for each item measured for payment. DATE OF COMPLETION: November 15,2026
Award
Playgrounds / Parks / Athletic Fields
$1,273,606.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 8, 2026
June 8, 2026
To Be Determined, Mt Sterling, IL
Related To This Project
Mt Sterling, IL
Bid Date: Apr 14 2026
Mt Sterling, IL
Bid Date: Feb 18 2026
Westchester, IL
Bid Date: Apr 07 2026
Roscoe, IL
Bid Date: Apr 01 2026
Charleston, IL
Bid Date: Mar 26 2026
Fox Township, IL
Bid Date: Mar 27 2026
Plattville, IL
Bid Date: Mar 27 2026
Minooka, IL
Bid Date: Mar 27 2026
Mattoon, IL
Bid Date: Mar 26 2026
Chicago, IL
Bid Date: Mar 31 2026
Sullivan, IL
Bid Date: Mar 26 2026
Kenilworth, IL
Bid Date: Apr 09 2026
Sullivan, IL
Bid Date: Mar 26 2026
Yorkville, IL
Bid Date: Mar 27 2026
Cypress, IL
Bid Date: Apr 16 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
