BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a playground / park / athletic field in Mt Sterling, Illinois. Completed plans call for site work for a playground / park / athletic field.

**As of May 08, 2026, the project was awarded to Martin & Company, with an awarded amount of $1,273,605.70.** Construct a 10 foot wide multi-use path approximately 1.9 miles long. Work will include earth excavation, construction of pavements, pipe culverts, cast-in-place concrete box culvert, precast concrete box culvert, concrete gutters, concrete sidewalk, concrete median surface, HMA paving, erosion control, pavement marking, signage, and related items. Project begins on new alignment near the intersection of 43rd and 45th Avenue in the City of Sterling, Illinois. Plans and proposal forms shall be obtained electronically in PDF format from the Willett, Hofmann & Associates, Inc. website at www.willetthofmann.com. Contractors shall click on "Bid Login" on the homepage of the website and follow the instructions. The Project Manual PDF can be downloaded from the website by depositing a non-refundable twenty-two dollars ($22.00) by credit card. All work shall be completed in accordance with the terms and conditions of the ordinances of Sterling Park District and Palmyra Township, including all specifications and regulations they refer to. The Contractor shall be familiar with the site locations, methodology of this work and standard construction procedures and practices prior to bidding. The location and elevations as shown on the plans may vary slightly during construction due to existing field conditions not readily apparent until the time of construction. The Engineer does not warrant or guarantee the correctness of the location of existing utility lines and site features as furnished by others. It shall be the contractor's responsibility to verify the correctness of the utilities and features prior to the start of construction by uncovering underground utilities in all locations where he feels the proposed construction may need to be altered to prevent conflicts in line, grade or working clearances. Changes in quantities approved by the Engineer shall be paid at the unit price for each item measured for payment. DATE OF COMPLETION: November 15,2026

Award

Playgrounds / Parks / Athletic Fields

$1,273,606.00

Public - City

Site Work

107

5

5

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
48
Bidding Soon
847
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2026

June 8, 2026

Project location map

To Be Determined, Mt Sterling, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.