BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2026 at 8:00 PM

Updated May 16, 2026

Site work, paving and renovation of a bridge / tunnel in Clinton, Ohio. Completed plans call for the renovation of a bridge / tunnel.

Caesar Creek Bridge Rehabilitation Project details include (reference plans for additional details) 1. Clearing and grubbing of existing site and removal of logjam debris 2. Chip and seal of roadway and bridge with minor asphalt patching 3. Permanent sheet pile installation 4. Embankment restoration with rock channel protection 5. Pier pile encasement 6. Guardrail / bridge railing rehabilitations 7. Site restoration and tree planting EDGE Participation Goal: 5.0% of contract Domestic steel use is required per ORC 153.011. Contract Estimated Cost Caesar Creek Bridge Rehabilitation $274,000.00

Sub-Bidding

Bridges / Tunnels

$274,000.00

Public - State/Provincial

Paving, Renovation, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
335
Active Projects
187
Bidding Soon
2,681
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2026

July 15, 2026

Project location map

To Be Determined, Clinton, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.