BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 14, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of an educational facility in Charleston, Illinois. Completed plans call for the renovation of a educational facility.

Question deadline is 04/08/2026. The project consists of renovating Baker Gym, Auxiliary Gym, Wrestling Room, and Weight Room. Work includes carpentry, interior finishes, bleachers, gym equipment, ventilation, and electrical. Prevailing wages in accordance with Coles County are required. Bid security is required in the form of a bid bond or certified check in an amount equal to ten percent (10%) of the base bid. Both a Performance Bond and a Labor and Payment Bond are required for this project, each in an amount equal to 100% of the contract price. Bids are to be submitted under a condition of irrevocability for a period of 30 days after submission. The Owner reserves the right to accept or reject any or all bids or any part thereof, to waive any informality in bidding, and to accept bids deemed most favorable to the owner. Prospective bidders may view, download, and print, and/or order hard copies of the plans and specifications at www.upchurchgroupplanroom.com. All official notifications, meeting minutes, addenda, if any, and other bidding documents will be offered only through www.upchurchgroupplanroom.com.

Bid Results

Educational

$1,041,000.00

Public - City

Renovation

34

25

8

8

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
58
Bidding Soon
974
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 13, 2026

May 4, 2026

Project location map

1615 Lincoln Ave, Charleston, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.