Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 19, 2026 at 8:00 PM
Updated May 21, 2026
Site work for a water / sewer project in Titusville, Florida. Completed plans call for site work for a water / sewer project.
TIFA LLC ("Owner") intends rehabilitate seven (7) production wells located within the TIFA Area IV Wellfield in Brevard County, Florida. TIFA LLC is a joint venture between the City of Titusville and Farmton Water Resources LLC. The wellfield is located on property owned by Miami Alternatives, LLC and Farmton 5A, LLC. A Vicinity Map and a Production Well Location Map for the TIFA Area IV Wellfield are attached as Figures 1 and 2, respectively. The Work generally involves the following activities for each production well: 1. Mobilization/Demobilization 2. Conformance with General Requirements 3. Pre-Rehabilitation Hydraulic Testing 4. Pre-Rehabilitation Video Survey 5. Brushing and Airlifting 6. Well Acidification via 20_ Baume Hydrochloric Acid 7. Well Development 8. Post-Rehabilitation Video Survey 9. Post-Rehabilitation Hydraulic Testing 10. Water Quality Testing 11. Well Site Cleanup 12. Re-install, Repair, and/or Replace Perimeter Fencing and Gates (if Necessary) 13. Re-sod (if Necessary) All Bidder email communications concerning this Bid shall be directed to Jim Boyd (jboyd@boydenvironmental.com) with a copy to Tracy Bailey (tracy.bailey@titusville.com).
Post-Bid
Water / Sewer
$400,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 23, 2026
May 25, 2026
To be determined, Titusville, FL
Related To This Project
Titusville, FL
--
Titusville, FL
--
Titusville, FL
Bid Date: May 11 2026
Titusville, FL
Bid Date: Jun 02 2026
Titusville, FL
Bid Date: May 11 2026
Titusville, FL
--
Titusville, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
