BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 16, 2026

Site work and new construction of an educational facility in Rancho Cordova, California. Completed plans call for the construction of a 51,430-square-foot, two-story above grade educational facility.

Construction And Installation Of Permanent Modular Buildings Granite Springs Elementary School Work includes factory construction of modular buildings including structure, all finishes inside and outside, casework, HVAC, lighting and plumbing; delivery to and on-site installation and connection of modules to foundation (provide embeds as needed to GC); field finishing including at mod lines (finishes, expansion covers, etc.); and other work as shown and described in Responsibility Matrix included in drawings. All proposers are required to read and completely familiarize themselves with the terms and conditions of the Bid, and to submit all necessary paperwork as required of proposer as specified in the Bid. All proposers, and all subcontractors listed in any proposal, must be registered with the California Department of Industrial Relations (DIR) pursuant to California Labor Code section 1725.5. The project is subject to compliance monitoring and enforcement by the DIR. This is a public works project and is subject to prevailing wage requirements and the successful proposer, and each of its subcontractors, shall be required to comply with all local, state, and federal laws and regulations. A payment bond is required for this project. The Project includes extension and coordination of utilities within 5' of buildings, construction and installation of modular buildings, field finishing as needed including finishes not applied or completed in factory, coordination with site contractor and low voltage contractor, other work as shown in the documents, in the Responsibility Matix, and as required for a complete an operational project. Question Deadline 04/13/2026 at 2:00 PM PT Any questions pertaining to the bid documents are to be directed via e-mail only to Michelle Brown, michelle.brown@hmcarchitects.com.

Bid Results

Educational

$6,054,496.00

Public - City

New Construction, Site Work

87

23

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
427
Active Projects
178
Bidding Soon
2,136
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2026

June 22, 2026

Project location map

1965 Birkmont Drive, Rancho Cordova, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.