BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 22, 2026 at 8:00 PM

Updated May 20, 2026

Demolition, site work, paving and new construction of a mixed-use development in Wheaton, Illinois. Completed plans call for site work for a 172,638-square-foot, three-story above grade road / highway; for paving for a road / highway; pre-engineered storage facility; water / sewer project; for the demolition of a pre-engineered storage facility; and for the construction of a pre-engineered storage facility.

The project consists of Complete demolition of the existing building on site. New pre-engineered metal building (PEMB) that includes concrete, masonry, carpentry, mechanical, electrical, plumbing, & fire protection. Detention basin earthwork, site utilities, asphalt paving, etc. Project consists of new Division of Transportation facilities on the DuPage County campus. Facilities include: HMF Facility, HMF Yard and storage, Salt Building, Wash Building, Fueling station, Parking Garage Lobby/ Elevator, North ring road improvements, Fairgrounds Restroom facility, & Fairgrounds Parking lot improvements. Scope includes: mass grading, site utilities, existing structure demolition, environmental abatement, CIP concrete, precast concrete (struct & arch), masonry, structural steel, carpentry, general trades, millwork, roofing, metal facade, aluminum systems and glazing, HM/wood/ FRP doors and frames, overhead doors, flooring, tiling, painting, finishes, fabric tensile roof structure, fueling dispenser/ tanks/ canopy, elevators, fire suppression, plumbing, HVAC, electrical, low voltage, solar renewable energy systems, fire alarm, landscaping, & stormwater planting specialist. The Work shall be conducted in multiple phases, with each phase substantially complete as indicated on the logistic plan. The focus is that some areas will not be available during certain time periods and must be accessible to the Owner (before and/or after). Other areas are intended to be turned over quicker than the final substantial completion for the full project to provide occupancy by Owner. Refer to Specification section 003100 for more information, including any blackout dates that must be avoided for specific areas and operations.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$10,000,000.00

Public - County

Demolition, New Construction, Paving, Site Work

500

30

331

6

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
598
Active Projects
307
Bidding Soon
4,687
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2026

May 18, 2026

Project location map

523 N County Farm Rd, Wheaton, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.