Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 15, 2026 at 8:00 PM

Updated June 16, 2026

Site work and paving for a bridge / tunnel in Sulphur, Oklahoma. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of May 28 2026 this project has not yet been awarded. A timeline for award has not yet been established. Sealed bids are requested for the furnishing and installation of a new wellsite access bridge for the City of Sulphur/Sulphur Municipal Authority. The scope includes furnishing a prefabricated bridge and providing all earthwork, concrete abutments, rip rap, and installation of the prefabricated bridge. Compliance with Labor Standards Contract Provisions and the Davis Bacon Act is mandatory if the total project cost exceeds ten million dollars. All work and materials must meet the provided plans and specifications. 1.00 L.S. Furnishing of Prefabricated Bridge 1.00 L.S. Earthwork, Concrete Abutment, Rip Rap, and Installation of Prefabricated Bridge Funding for this project is provided through American Rescue Plan Act (ARPA) grant program. Assuch, compliance with Labor Standards Contract Provisions is mandatory. Compliance with the Davis Bacon Act is mandatory if the total project cost exceeds $10,000,000 (ten million dollars). Instructions to bidders include: - Bids must be submitted by the specified deadline. - Plans and specifications must be obtained from the Engineer to be recognized as an eligible bidder. - Bids must be accompanied by a certified or cashier's check or a bidder's bond for 5% of the bid amount, as a guarantee. - A sworn statement regarding non-collusion must accompany the bid. - Construction, maintenance, and statutory payment bonds for 100% of the contract cost are required, from a surety licensed in Oklahoma and approved by the Owner and Engineer. - Compliance with equal opportunity, EPA Disadvantaged Business Enterprise requirements (including good faith efforts to solicit DBEs), and federal wage rules if applicable. - System for Award Management (SAM) registration is required for all applicants and awardees. - The contract will be awarded to the lowest, responsive, responsible bidder. The owner reserves the right to correct clerical errors, reject any and all bids, and will not accept conditional bids.

Post-Bid

Bridges / Tunnels

$400,000.00

Public - City

Paving, Site Work

12

21

12

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
57
Bidding Soon
873
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2026

May 18, 2026

Project location map

To be determined, Sulphur, OK

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed