BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 12, 2026 at 8:00 PM

Updated June 13, 2026

Site work and paving for a road / highway in Sulphur, Oklahoma. Completed plans call for site work for a road / highway.

Street reconstruction work includes full reconstruction of West 9th Street from W. Broadway Ave. to W. Muskogee Ave., approximately 500 feet. Work generally includes removals, earthwork, storm sewer improvements, sanitary sewer improvements, water line improvements, asphalt paving, aggregate base, stabilized subgrade, concrete curb and gutter, concrete commercial drives, traffic striping, pavement markings, and related appurtenances. Major items include approximately: removal of existing asphalt (2,218 SY, 6-inch), removal of existing curb & gutter (752 LF), unclassified excavation (1,627 CY), storm sewer pipe installation (463 LF, various sizes), 5 ft x 5 ft RC box culvert (1 EA), storm manholes (5 EA), curb inlets (3 EA), sanitary sewer pipe (523 LF, PVC SDR-35), sanitary manholes (4 EA), water line (677 LF, C-900 PVC), asphalt paving (244 TON 2-inch Superpave Type S4, 488 TON 4-inch Superpave Type S3), aggregate base (619 CY), concrete commercial drive (282 SY, 8-inch P.C.), stabilized subgrade (2,727 SY), concrete curb & gutter (670 LF), and thermoplastic striping (3,188 LF). For all further requirements regarding Bid Submittal, qualifications, procedures, and Contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Proposers may secure copies of the Bid Documents by contacting the Project Coordinator or downloading from the designated website after registering as a Plan holder. Only prospective bidders who obtain documents through the designated source will be registered as document holders and automatically receive any addenda. No partial sets will be issued. Neither the Owner nor Engineer will be responsible for documents obtained from other sources. Prospective bidders may obtain or examine the documents at the issuing office during normal business hours.

GC Bidding

Roads / Highways

$700,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
87
Bidding Soon
1,050
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 6, 2026

August 20, 2026

Project location map

West 9th Street from W Broadway Ave to W Muskogee Ave, Sulphur, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.