BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Norwood, Massachusetts. Completed plans call for site work for a water / sewer project.

Sewer lining and excavation and replacement of manholes. Submit questions to robertsgm@cdmsmith.com The work of this Contract includes furnishing all labor, materials, equipment, and incidentals required to perform rehabilitation of the existing sewer system as shown on the project Drawings, which are located in Norwood, Massachusetts. Sewer rehabilitation work includes but is not limited to the following: preparatory cleaning of existing sewers, sewer manholes and sewer services; closed-circuit television inspection; installation of cured in place pipe lining in mainline 8-in. sewer (3,300 LF) and service laterals (77 ea.); excavation of a lining pit to expose and break into existing laterals, lateral lining, and lateral repair (33 ea.); protruding tap removal; manhole rehabilitation (114 VF); and all related work and miscellaneous items as specified herein and as shown on the Drawings required to complete the contract. The Meadowbrook Area Sewer Rehabilitation project is partially funded by the Massachusetts Water Resource Authority (MWRA). Minority Business Enterprise (MBE) and Women's Business Enterprise (WBE) policies of the MWRA are applicable to this Contract. The goal is for this project area a minimum of: (1) a minority employee workforce hour goal of 10.0 percent, (2) a women employee workforce hour goal of 6.9 percent, (3) a goal of 7.24 percent anticipation of Minority-owned Business Enterprise(s) and (4) a goal of 3.60 percent participation of women-owned Business Enterprise(s) within the project contracts. Question Deadline 04/17/2026 All questions about the meaning or intent of the Contract Documents shall be received by email by CDM Smith, robertsgm@cdmsmith.com, at least ten days before the date set herein for the opening of bids. Written clarifications or interpretations will be issued by Addenda not later than five days before the bid opening date

Bid Results

Water / Sewer

$1,428,425.00

Public - City

Site Work

13

12

6

5

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
771
Active Projects
481
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2026

June 29, 2026

Project location map

Multiple Locations, Norwood, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.