BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 6, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a civil project in Downers Grove, Illinois. Completed plans call for site work for a bridge / tunnel; and bridge / tunnel.

The improvements to be constructed under this contract shall be performed along the Illinois Tollway at the following locations in Lake, DuPage, and Cook County, Illinois Bridge 120 (016-9717) Northbound I-294 over Ashland Avenue, CN Railroad, and Wood Street Bridge 141 (016-9849) Northbound I-294 over 135th Street Bridge 142 (016-9848) Southbound I-294 over 135th Street Bridge 157 (016-9841) Northbound I-294 over 115th Street Bridge 165 (016-9832) Northbound I-294 over Southwest Highway Bridge 273 (022-9996) Northbound I-294 to Westbound I-88 Ramp over I88 and Salt Creek Bridge 331 (016-0531) Willow Road over I-294 Bridge 447 (049-0094) Westbound I-94 over Southbound US 41 TS4.00R, NB Retaining Wall barrier on Northbound I-294 MP 4.10 Culvert at I-294 Milepost 14.1 TN22.30N, EB Noise Abatement Wall on I-94 MP 22.30 The work consists of partial depth transition and approach slab repairs, removal and replacement of joints, cleaning and resealing joints, PPC beam repairs, cleaning and painting existing bearings, structural repair of concrete, removal and replacement of guardrail, parapet removal and replacement, epoxy crack injection, MSE wall panel stabilization, noise abatement wall repairs, culvert pipe joint repair, asphalt shoulder repairs, bridge deck repairs, maintenance of traffic, and other miscellaneous work across Lake County, DuPage County, and Cook County, Illinois. Bidders may be required to be pre-qualified by the Illinois Department of Transportation (IDOT). Joint ventures are limited to no more than three individually IDOT pre-qualified members. Bidders must be registered, or submit evidence of application, with the Illinois Department of Human Rights (IDHR). All bids must be on forms prescribed by the Illinois Tollway and must comply with the terms and conditions set forth in the contract documents. A Bid Guaranty amounting to five percent of the total bid is required. Award will be made to the lowest responsive and responsible bidder, but the Tollway reserves the right to reject any and all bids, to waive technicalities, or cancel the solicitation. Plan Holder questions should be provided to 4849D.2034_Questions@docs.e-builder.net as identified Final Date for Plan Holder Questions- April 10, 2025 at 2:00 P.M local time

Bid Results

Bridges / Tunnels

$5,847,539.00

Public - State/Provincial

Paving, Site Work

7050

11

16

9

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
579
Active Projects
285
Bidding Soon
4,708
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2026

July 20, 2026

Project location map

Multiple Locations, Downers Grove, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.