Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 30, 2026 at 8:00 PM
Updated May 20, 2026
Renovation of a municipal facility in Burlington, Massachusetts. Completed plans call for the renovation of a municipal facility.
Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. 29/25 CENTER STREET BURLINGTON, MA 01803 Question Deadline 04/20/2026 Every request for such interpretation should be sent via email to ewellington@ceseng.com rconnors@ceseng.com The deadline for questions will be 3 business day prior to the scheduled bid opening date. Work covered by the Contract Documents: 1. The Project consists of electrical scope and other incidental trades as indicated on Drawings and/or as specified herein in the Specifications, all as amended by applicable addenda. a. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all. For example, any item indicated in the Specifications which is omitted from the Drawings or vice versa shall be construed as though contained in both. Should the Drawings or the Specifications disagree in themselves or with each other, the General Contractor shall provide the better quality or greater quantity of Work unless otherwise directed by written addendum to the Contract. b. Completeness: The Work shall be as shown on the Contract Documents and be complete in every respect and in conformance with all applicable requirements of the governing laws and codes. C. Building Permits: General Contractor shall be responsible to ensure all required permits are obtained, and that the work pertaining to permits is properly inspected and certified. Filed Sub contractors are required to obtain permits relating to their work. Fees associated with Building Permits shall be waived by the Town of Stoughton.
Bid Results
Municipal
$621,231.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 23, 2026
May 21, 2026
29 Center St, Burlington, MA
Related To This Project
Burlington, MA
Bid Date: May 08 2026
Burlington, MA
Bid Date: Jun 15 2026
Burlington, MA
Bid Date: May 01 2026
Burlington, MA
Bid Date: Jun 04 2026
Burlington, MA
Bid Date: Apr 08 2026
Burlington, MA
Bid Date: Mar 19 2026
Burlington, MA
Bid Date: Apr 01 2026
Burlington, MA
Bid Date: Apr 08 2026
Burlington, MA
Bid Date: Apr 01 2026
Burlington, MA
Bid Date: Mar 18 2026
Burlington, MA
Bid Date: Mar 12 2026
Burlington, MA
Bid Date: Mar 02 2026
Burlington, MA
Bid Date: Feb 03 2026
Burlington, MA
--
Burlington, MA
Bid Date: Feb 10 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
