Published May 9, 2026 at 8:00 PM

Updated May 16, 2026

Renovation of an educational facility in Arcadia, California. Completed plans call for the renovation of a educational facility.

The project is for roofing services at Camino Grove Elementary School. Bids are to be submitted according to the specifications in Bid No. 230:25-26. The General Contractor must ensure that all subcontractors meet all requirements and certifications at the time of bid. All bids must be made on forms provided by the district and conform to the contract documents. Attendance at a mandatory job walk and pre-bid conference at Camino Grove Elementary School is required. Contractors and any subcontractors must pay at least the prevailing wage rates and provide certified payroll. A C-39 Contractor's License is required. All contractors must be registered with the DIR to bid on public works projects. There is a District goal of 3 percent DVBE participation. No bidder may withdraw their bid for sixty days after the bid opening. Remove and properly dispose of existing built-up roofing, including sheet metal, gutters, and penetration flashings. 2. Repair / replace deteriorated wood sheathing as needed. Replacement to be per unit cost on bid form for each sheathing type. All repairs to be verified with the District prior to commencing. 3. ROOF ASSEMBLIES: Type I - Classrooms _ Over the 1 x 6 spaced sheathing, install R10 poly-iso insulation board, laid loose. _ Over the insulation, install 1/4" Dens Deck Prime cover board, fastened at a rate of one fastener every 3.2 square feet (8 each per 4' x 8' board) in the field, one every two square feet (16 each per 4' x 8' board) in the perimeter, and one every 1 square foot (32 each per 4' x 8' board) using # 12 fasteners. Minimum fastener penetrations shall be 1-1/2" Over the Dens Deck Prime board, install two ply Derbigum GP torch applied roof system with Cool Roof certified CR cap sheet, per specification 07 52 00-30 Year Reroof System. Roof membrane is to be heat weld applied. Type II - Covered Walkways _ Over the 1 x 6 spaced sheathing, install tapered poly-iso insulation board, laid loose. _ Over the insulation, install %" Dens Deck Prime cover board, fastened at a rate of one fastener every 3.2 square feet (8 each per 4' x 8' board) in the field, one every two square feet (16 each per 4' x 8' board) in the perimeter, and one every 1 square foot (32 each per 4' x 8' board) using # 12 fasteners. Minimum fastener penetrations shall be 1-1/2". NOTE: Adhere insulation and cover board at any areas where underside of deck is exposed to avoid fasteners showing. _ Over the Dens Deck Prime board, install two ply Derbigum GP torch applied roof system with Cool Roof certified CR cap sheet, per specification 07 52 00-30 Year Reroof System. Roof membrane is to be heat weld applied. 4. Terminate all roof edge conditions with 24-gauge galvanized metal edge, per Derbigum standard details. Color to be selected by District. Edge detail shall include a minimum 22-gauge galvanized cleat. NOTE: The District standard for edge conditions does notallow a raised gravel stop edge, 5. Install new two-ply membrane flashings at all baseflashings, parapets, and roof equipment curbs. Provide new 24-gauge sheet metal pad flashings. 6. Terminate Flashings with aluminum termination bar and fasteners at 12" O.C. 7. Install Derbigum RS liquid applied reinforced flashings at all pipe, conduit, vent, and support locations. Properly prepare all penetration surfaces to ensure proper adhesion of flashings. 8. Provide new counterflashings at all baseflashing locations. 9. Remove and cover any in-lay gutters throughout campus roofs 10. Provide new exterior gutters at all locations to match existing profile. Gutters to be 24 gauge galvanized (unpainted). 11. Provide 30-year manufacturers warranty. Question Deadline 04/09/2026 Questions regarding the project should be directed to Tony Barrios at tbarrios@ausd.net, Rudy Vergara at rvergara@ausd.net or Jaime Morales at jmorales@ausd.net.

Bid Results

Educational

$1,247,824.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
571
Active Projects
257
Bidding Soon
2,787
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2026

June 5, 2026

Project location map

700 Camino Grove Ave, Arcadia, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.