BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 28, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a sidewalk / parking lot in Brainerd, Minnesota. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Award: Sir Lines-a-Lot in the amount of $29,150.62 City of Brainerd is requesting bids for the construction of Improvement 26-03 - 2026 Brainerd Pavement Markings. The project includes pavement markings. All bidders are required to become acquainted with the extent of the work and the conditions under which the work will be performed. Bids shall be submitted electronically via BidVAULT and must be accompanied by a cash deposit, cashier's check, bid bond, or certified check payable to the City of Brainerd for not less than 5% of the bid. The City Council reserves the right to reject any or all bids or parts of any bid, to waive minor defects, technicalities, or informalities, or to advertise for new proposals, and to accept the bid deemed to be in the City's best interest. No bid may be withdrawn for at least 90 days after the scheduled closing time for the receipt of bids. The Project includes the following Work: Pavement Markings. Questions regarding this Project, including any questions prior to bidding, shall be directed to Jessie Dehn, City Engineer at (218) 828-2307 or JDehn@ci.brainerd.mn.us. Locations- 1 : N. 4TH ST. - (From Washington St./TH 210 to Bluff Ave.) f 2\ N. 6TH ST. - (From Washington St./TH 210 to Kingwood St.) 3: N. 8TH ST. - (From Washington St./TH 210 to Grove St.) 4: FRONT ST.- (From S. 4th St. to S. 10Th St.) 5: KINGWOOD ST. (From N. 1 St. to Washington St./TH 210) 6: BLUFF AVE. - (From N. 3rd St. to 7th St.) 7: FIR ST. - (from N. 7th St. to N. 11th St.) 8: EVERGREEN AVE. - ( From N. 11th St. to 1st Ave. NE.) 9: H ST. - (From 1st Ave. NE to 8th Ave. NE.) 10: 4TH Ave. NE. - (From Washington St. to H St.) 11: 10TH AVE. NE. - ( From TH 25 to Washington St./TH 210) 12 : 13TH AVE. NE. - ( From Washington St./TH 210 to N St.) 13: N ST. - (From Mill Ave. to 13th Ave. NE.) 14: MCKAY RD. - (From Riverside Dr/CSAH 20 to Highview Cir.) 15: NW. JACKSON ST. - (From Brainerd City Limits to NW. 4Th NW. St./CSAH 20) 16: NW 7TH ST.- From Washington St./TH 210 to NW. Jackson St.) 17: NW. 4TH ST. - (From Laurel St. to Washington St./TH 210) 18: NW. 4TH ST. - (From Washington St./TH 210 to Brainerd City Limits Beaver Dam RD.) 19: S. 4TH St. - (From Laurel St. to Washington St./TH 210) 20: S. 5TH St. - (From Quince St. to Front St.) 21 : S. 7TH ST. - (From Oak St. St. to Norwood St.) 22: S. 8TH ST. - (From Willow St. to Washington St./TH 210) 23: S. 9TH ST. - (From S. Maple St. to Front St.) 24: S. 10TH ST. - (From Laurel St. to Front St.) 25: OAK ST. - (From S. 5th St. to S. 6th St.) 26: S. QUINCE ST. - (From S. 5th St. to S. 8th St.) 27: NORWOOD ST. - (From S. 6th St. to S. 8th St.) 28: S. MAPLE ST. - (From S. 6th St. to S. 8th St.) 29: LAUREL ST. - (From SW. 4th St. to S. 10th St.) 30: SW 4TH St. - (From College Drive to Washington St./TH 210) 31 : EAST RIVER RD. - (From Willow St. to Washington St./TH 210)

Award

Sidewalks / Parking Lot

$29,151.00

Public - City

Paving, Site Work

4

6

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
56
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2026

June 1, 2026

Project location map

Multiple Locations, Brainerd, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.