BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 18, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a civil project in San Clemente, California. Completed plans call for site work for a water / sewer project.

The work consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the plans, specifications, and contract documents for the construction of Storm Drain Improvements at East Avenida Cordoba and Via Avila, City of San Clemente. The general method of storm drain construction work includes demolition and replacement of existing concrete catch basins, local depressions, cross gutter, asphalt concrete pavement, and Portland cement concrete curb and gutters, sidewalks, curb ramp, traffic detector loops, trenching and installation of new reinforced concrete pipes within existing roadways and right-of-ways, erosion control BMPs, and construction of new concrete junction structures, manholes, and collars. The work also includes traffic control. Bidders must have a California Contractor's License Class "A." Bid bond of 10%, payment bond of 100%, and performance bond of 100% are required. Attendance at the pre-bid meeting is mandatory. QA deadline changed from 05/12/2026 as per Adda 3. Online Q&A Yes Bid Date 06/26/2026 at 2:00 PM PT The work to be performed, in general, consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and contract documents for the construction of the Storm Drain Improvements at East Avenida Cordoba and Via Avila, City of San Clemente. The general method of the storm drain construction work includes demolition and replacement of existing concrete catch basins, local depressions, cross gutter, A.C. pavement and Portland cement concrete curb & gutters, sidewalks, curb ramp, traffic detector loops, trenching and installation of new Reinforced Concrete pipes (RCP) within existing roadways and Right-of-Ways, erosion control BMP's, and construction of new concrete junction structures, manholes and collar. The work also includes traffic control.

GC Bidding

Water / Sewer

$1,700,000.00

Public - City

Site Work

84

46

6

6

Subscribe For Documents

91 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
666
Active Projects
348
Bidding Soon
4,503
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2026

January 27, 2027

Project location map

E Avenida Cordoba & Via Avila, San Clemente, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.