BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 24, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a sidewalk / parking lot in Villa Park, Illinois. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

This project consists of excavating existing asphalt alley pavement and landscaped areas to install concrete alley pavement between Princeton Avenue and Ardmore Avenue north of Terrace Street. It includes the excavation at Princeton Avenue and the proposed alley pavement to install an alley return where one does not currently exist. Asphalt parking lots adjacent to the proposed alley pavement will be replaced or extended in kind from the proposed alley pavement to the public right-of-way limits. To install the alley return, sections of the existing curb and gutter, sidewalk, and asphalt pavement shall be removed and replaced. The project also includes erosion and sediment control, restoration, and other related and incidental work. Mandatory paperwork for the bid is provided within the bid documents and must be completed and submitted with the bid submittal. Weekly documentation and prompt submittal of documentation during construction is required. Question Deadline 04/09/2026 at 4:00 PM CT All requests for information or clarification shall be submitted to the Village of Villa Park by email to engineering@invillapark.com. All responses that are provided to requests for information or clarification will be provided through online Alley between Princeton Ave. & Ardmore Ave., North of Terrace St

Bid Results

Sidewalks / Parking Lot

$146,292.00

Public - City

Paving, Site Work

10

6

2

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
592
Active Projects
309
Bidding Soon
4,659
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2026

May 14, 2026

Project location map

Multiple Locations, Villa Park, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.