Site work for a transportation facility in Clark, South Dakota. Completed plans call for site work for a transportation facility.

Sealed bids are invited for furnishing all equipment, labor, and materials, and performing all work incidental to the Automated Weather Observing System (AWOS III-P) at the Clark County Airport, Clark, South Dakota. The primary work includes: Mobilization, Construction Safety Phasing Plan, Temporary Phasing Work, Electrical, Demolition Work, Electrical, AWOS III-P System (complete and commissioned), Terminal/SRE Building Work (Electrical, complete), Vault Building Work (Electrical, complete), installation of 2800 feet of 1/C No. 4 Cu AWG, 600V, THWN-2 in conduit, 1400 feet of 1/C No. 8 Cu AWG, 600V (GND), THWN-2 in conduit, removal and disposal of existing cable, 600 feet of trenching and backfilling or plowing for conduit, 600 feet of non-encased electrical conduit (2-inch, Type I, Sch. 40 PVC in trench or SDR 13 HDPE plowed), 800 feet of non-encased electrical conduit (2-inch, Type III, SDR 11 HDPE bored), 8 cable markers, 5 L-867B (12) Class 1A junction boxes with flat etched steel covers, and other related construction items. Each bid must include a certified check, cashier's check, or draft for five percent (5%) of the total bid, or a ten percent (10%) bid bond from a surety authorized in South Dakota. Payment and performance bonds for 100% of the contract amount will be required. The contractor must commence work within ten days of the "Notice to Proceed," and complete it within the specified time in the specifications. Bidders must comply with federal labor laws, minimum wage rates, affirmative action requirements, and other federal regulations listed in the project specifications. The right is reserved to reject any or all bids and to waive informalities. Engineer a written request for interpretation no later than 5 days prior to bid opening.

Bid Results

Transportation Terminals

$229,425.00

Public - County

Site Work

30

17

4

7

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
16
Bidding Soon
310
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2026

May 11, 2026

Project location map

1626 Airport Dr, Clark, SD

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.