Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 11, 2026 at 8:00 PM
Updated September 13, 2026
Site work for a water / sewer project in Galveston, Texas. Completed plans call for site work for a water / sewer project.
https://www.star-telegram.com/news/article316693584.html An offer to privately finance the costs to prepare a federal grant application for the Inner Harbor desalination project in Corpus Christi is off the table. A local organization, Voices for Coastal Bend Energy, had proposed fronting the costs - estimated between $50,000 and $60,000 - to complete and finalize the application to the U.S. Bureau of Reclamation for potentially as much as $120 million in grants. VCBE is described on its website as a "coalition of businesses, organizations, and community leaders dedicated to advancing policies and investments that strengthen the Coastal Bend's energy reliability, water security, and economic competitiveness." The offer was turned down in a 5-4 vote, with City Council members Gil Hernandez, Carolyn Vaughn, Kaylynn Paxson, Eric Cantu and Sylvia Campos rejecting the offer, and Mayor Paulette Guajardo and City Councilmen Mark Scott, Roland Barrera and Everett Roy supporting it. Had it been accepted, the funding was planned to cover the costs of staff time and professional services to complete the application, officials said. The offer from VCBE was prompted by a 5-4 council vote in June to pass on pursuing the federal grant funding for the Inner Harbor desalination plant, the facility itself estimated at $979 million for development. The proposed Inner Harbor project had been deemed eligible for federal grant funding in May, according to officials; however, the application would require a council resolution to approve the project that would receive the funds. The council has consistently voted 5-4 against progressing the project, largely citing cost concerns and disagreement over whether there has been sufficient study of potential effects of desalination operations on the bay system. Like previously, council members pointed out that although there is $120 million available, it may be split among several projects. Some council members supporting acceptance of VCBE's offer had hoped that the funding would be approved so work to complete the application - due Aug. 26 - could be underway while the council continues discussion on whether to approve the Inner Harbor project. Others pointed out that the project is not approved and voiced concerns that the funding was being offered through an organization without specific names of individual donors. Kirsten Crow covers city government and water news. Have a story idea Contact her at kirsten.crow@caller.com. Consider supporting local journalism with a subscription to the Caller-Times. This article originally appeared on Corpus Christi Caller Times: Federal grant funding for Inner Harbor desalination off the table Reporting by Kirsten Crow, Corpus Christi Caller Times / Corpus Christi Caller Times _______________________________________________________________________________________________________________________________ Repair offshore breakwater structures at Placement Area (PA) 6 for the Corpus Christi Ship Channel project, including reinforcing existing shoreline protection with new riprap. The work will be performed at an upland placement site located on the south side of the ship channel and accessible only by boat. Efforts will focus on restoring and strengthening the integrity of the existing breakwater system to support long-term shoreline stability and project functionality. Location: Nueces County, Texas Estimated magnitude for this effort is estimated between $15,000,000.00 and $20,000,000.00. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. NUECES 0803-0365 Award is subject to final approval.
Award
$9,627,726.00
Public - Federal
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 13, 2026
September 11, 2026
To Be Determined, Galveston, TX
Related To This Project
Galveston, TX
--
Galveston, TX
Bid Date: Jul 20 2026
Galveston, TX
Bid Date: Aug 27 2026
Galveston, TX
--
Galveston, TX
Bid Date: Aug 10 2026
Galveston, TX
--
Galveston, TX
Bid Date: Jul 20 2026
Galveston, TX
--
Galveston, TX
Bid Date: Jul 10 2026
Galveston, TX
--
Galveston, TX
--
Galveston, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
