Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 3, 2026 at 8:00 PM
Updated May 20, 2026
Renovation of a municipal facility in Asheville, North Carolina. Completed plans call for the renovation of a 41,647-square-foot municipal facility.
Location: Southern Research Station Headquarters 200 WT Weaver Blvd Asheville NC 28804 POC: Kevin Blanton 828-257-4345 3.0 Background The existing HVAC water cooled chiller serving the 41,647 GSF Southern Research Station Headquarters has failed and needs to be replaced. All labor, equipment, and materials are to be supplied by the contractor. All work shall be accomplished in accordance with International Building Codes, ASHRAE standards, NEC, NFPA codes, Energy Star, and other applicable codes and standards. No potentially hazardous materials are expected to be encountered during the execution of work under this Scope of Work. Should the contractor encounter any additional suspected hazardous materials, stop work and contact the Contracting Officer Representative (COR) immediately. Contractor Requirements 4.0 Technical Requirements/Tasks Note: - Contractor shall verify all measurements and existing equipment specifications. - All waste material and debris shall become the property of the contractor. The contractor shall remove and dispose of all waste in accordance with all codes and regulations. 4.1 Chiller Replacement • Contractor shall provide turnkey removal and replacement of one (1) 165-ton water-cooled chiller including all labor, materials, equipment, rigging, disposal, piping, insulation, vibration isolation, electrical, and commissioning required for a complete and operational system. • Chiller shall meet capacity, efficiency, refrigerant type, and pressure/temperature ratings per project requirements and applicable codes. Includes chilled water and condenser water connection compatibility, vibration control, isolation valves, strainers, gauges, and insulation. • Recover refrigerant per EPA regulations, disconnect electrical and piping, drain systems as needed, remove and dispose of existing chiller using approved rigging plan, protect surrounding equipment, and manage all waste in accordance with regulations. • Set new chiller on structural pad or vibration base, reconnect chilled water and condenser water piping, install flexible connectors and valves, reinstall insulation, reconnect electrical feeders and grounding, perform pressure testing and leak checks. • Testing and Commissioning: Flush and clean piping, coordinate chemical treatment, perform system fill and vent, verify pump flow, perform manufacturer startup, verify temperatures, pressures, and full load capacity, and document system performance.
Post-Bid
Municipal
$100,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 9, 2026
May 11, 2026
200 WT Weaver Blvd, Asheville, NC
Related To This Project
Asheville, NC
Bid Date: May 19 2026
Asheville, NC
--
Asheville, NC
--
Asheville, NC
--
Asheville, NC
--
Asheville, NC
--
Asheville, NC
--
Asheville, NC
--
Asheville, NC
Bid Date: May 19 2026
Asheville, NC
Bid Date: Apr 24 2026
Asheville, NC
Bid Date: Apr 23 2026
Asheville, NC
Bid Date: Apr 09 2026
Asheville, NC
--
Asheville, NC
--
Asheville, NC
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
