BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 20, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a civil project in Port Hardy, British Columbia. Completed plans call for site work for a water / sewer project; and bridge / tunnel.

The District of Port Hardy is seeking to replace the Quatse Loop Walking Bridge and the associated utility services crossing the Quatse River. The existing bridge currently supports a water main and a sewer forcemain. This project will require full replacement of the bridge, modifications to its foundations, and replacement of the attached utility infrastructure. All work must be completed while maintaining uninterrupted potable water service and continuous collection of sewer flows through a temporary bypass system. SCOPE OF WORK The District will enter into a single Design-Build Agreement with the successful Proponent. The Design-Builder shall provide: All professional design services; All environmental permitting and regulatory coordination; All labour, materials, equipment, supervision, and subcontracted services; All temporary works; Construction management and execution; Project management; Testing, commissioning, and close-out documentation. The Project consists of: Removal and disposal of the existing pedestrian bridge structure; Design and construction of a new pedestrian bridge structure and foundation if applicable; Integration, upgrade, relocation, and secure attachment of existing municipal water and sanitary sewer mains to the new bridge structure, including the provision and operation of temporary water lines and bypass sewer pumping systems to ensure uninterrupted water supply and sanitary sewer service for the full duration of the project. Completion of all in-water and near-water works in compliance with approved fish window restrictions; Environmental protection, monitoring, and regulatory compliance; Commissioning and final delivery of the completed Works.

Post-Bid

Bridges / Tunnels

$256,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
1
Bidding Soon
15
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2026

June 1, 2026

Project location map

8495 Byng Rd, Port Hardy, BC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.