Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 30, 2026 at 8:00 PM
Updated March 31, 2026
Site work, paving and new construction of a mixed-use development in Fort Hood, Texas. Working plans call for the construction of a power facility; for site work for a power facility; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The work consists of constructing a new Central Energy Plant to serve the Fort Hood Phantom East District. The Central Energy Plant will supply chilled water to 24 buildings, replacing 24 existing air-cooled chillers, and is not part of the Fort Hood privatized utilities system. Primary facilities include a building housing cooling towers, chillers, associated pumps, controls, and related equipment, along with distribution piping to the supported buildings. The project also includes fire protection and detection systems, Energy Monitoring and Control Systems, sustainability and energy efficiency measures, and required cybersecurity features. Supporting work includes installation and connection of new gas, water, sewer, and electrical utilities; security lighting; paving; walkways; curbs and gutters; storm drainage; site clearing and grading; fencing; landscaping; and signage. Special foundations are required due to expansive and rocky soil conditions, and heating will be provided by a self-contained system. Facilities will be designed for a minimum service life of 40 years in accordance with applicable Department of Defense Unified Facilities Criteria, including requirements for energy efficiency, building envelope performance, and integrated building systems. Location: Fort Hood Phantom East District, Fort Hood, Texas PROJECT INFORMATION: The TARGET PRICE RANGE is between $25,000,000 and $30,000,000 The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Power Plant
$30,000,000.00
Public - Federal
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 10, 2026
To Be Determined, Fort Hood, TX
Related To This Project
Fort Hood, TX
Bid Date: May 20 2026
Fort Hood, TX
Bid Date: May 31 2026
Fort Hood, TX
Bid Date: May 08 2026
Fort Hood, TX
Bid Date: Jun 15 2026
Fort Hood, TX
--
Fort Hood, TX
Bid Date: Apr 23 2026
Fort Hood, TX
--
Fort Hood, TX
Bid Date: Mar 31 2026
Fort Hood, TX
Bid Date: Apr 16 2026
Fort Hood, TX
--
Fort Hood, TX
Bid Date: Feb 03 2026
Fort Hood, TX
Bid Date: Dec 29 2025
Fort Hood, TX
Bid Date: Dec 28 2025
Fort Hood, TX
Bid Date: Dec 23 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
