BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 25, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in New York, New York. Completed plans call for site work for a water / sewer project.

Upgrade of Dissolved Oxygen (DO) Control System at Oakwood Beach WWRRF (WRRF). This is a Competitive Sealed Bid released through PASSPort, New York City's online procurement portal. Responses should be submitted via PASSPort. To access the solicitation, vendors should visit the PASSPort Public Portal and use the EPIN 82626B0013 in the Keywords search field. If assistance is needed in submitting a response, contact help@mocs.nyc.gov. The scope of work under this Contract is to provide the necessary labor, materials, and equipment to install sixty-four (64) new actuators, sixteen (16) new dissolved oxygen sensors, sixteen (16) new transmitters, and all associated electrical and instrumentation and controls for improved automation and control of dissolved oxygen at the existing aeration tanks at the Oakwood Beach Water Resource Reclamation Facility (WRRF). The Work includes, but is not limited to: o the demolition of the existing eight (8) dissolved oxygen sensors, sixty-four (64) actuators on eight inch (8") butterfly valves, four (4) transmitters; o the subsequent installation of sixteen (16) new dissolved oxygen sensors, sixty-four (64) new actuators on eight-inch (8") butterfly valves, sixteen (16) wall mounted transmitters, sixty-four (64) new 480V, 3-Phase, 30A, NEMA 4X disconnect switches, four (4) new 480V, 3-phase, 60Hz, NEMA 4X Valve Distribution Panels, two (2) new circuit 480V, 3-phase, 50AT/100AF circuit breakers in existing MCC-8 spare bucket (as indicated in the Contract Drawings), two (2) new circuit 480V, 3-phase, 50AT/100AF circuit breakers in existing MCC-9 spare bucket (as indicated in the Contract Drawings), mounting hardware and other appurtenances for the sixteen (16) new dissolved oxygen sensors and sixteen (16) new transmitters, eight (8) new signal splitters to split signals to new PMCS and existing Bridge, four (4) new Aeration Tank Process Aeration Panels with PLC I/O, network switch, and all components in the Aeration Tanks Area of the Treatment Building, new Control Room Process Aeration Control Panel with PLC, HMI, and all components in the Main Building Electrical Room, PLC and HMI programming for automatic control of the process air valves as specified. ** Question deadline is 4/10/2026 All questions must be submitted in the Discussion with Buyer forum in PASSPort.

Bid Results

Water / Sewer

$6,923,100.00

Public - City

Site Work

27

16

2

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,233
Active Projects
644
Bidding Soon
8,640
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2026

July 1, 2026

Project location map

683 Mill Rd, New York, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.