BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 10, 2026 at 8:00 PM

Updated June 11, 2026

Site work and paving for a road / highway in Spanish Fork, Utah. Completed plans call for site work for a road / highway.

**As of June 10, 2026, the project was awarded to Rino Excavating, with an awarded amount of $2,932,150.40.** Work includes all costs for labor, materials, equipment, and appurtenances required to furnish and install 1-inch culinary water service lateral. Price includes main connection and installation, protecting existing utility facilities, performing exploratory excavation (potholing) to identify utility conflicts, and coordinating with the conflicting utility for needed relocations; and all pipe, tapping, or other fittings, loops, dewatering if needed, trenching and backfill with engineered backfill, and compacting voids. Price includes pressure testing and recommissioning the line in accordance with Spanish Fork City standard specifications. The work zone will be kept in an orderly manner and cleaned daily. The work zone will be watered and or swept as needed, or at the City's request, to control dust or debris. A self-propelled street sweeping broom shall be kept on site at all times. Contractor shall be responsible to secure work zone during construction to prevent unauthorized vehicul Spanish Fork City is looking for a contractor to a Roadway. Question Deadline 04/17/2026 at 2:00 PM MT

Under Construction

Roads / Highways

$2,932,150.00

Public - City

Paving, Site Work

45

21

11

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
39
Bidding Soon
1,149
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2026

June 1, 2026

Project location map

Verk Drive, Spanish Fork, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.