BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 31, 2026 at 8:00 PM

Updated April 1, 2026

Site work and paving for a transportation facility in Spanish Fork, Utah. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

The work includes the construction of a partial length parallel Taxiway B (approximately 2,000 linear feet) and connectors B2 and B3, with related electrical work such as lights, lit signs, conduit, cables, and duct banks. The project also involves repair of a 100-ft by 10-ft section of Runway 12-30. Tasks to be performed include excavation, subgrade preparation, grading, underdrain and drainage improvements, aggregate subbase and base courses, asphalt paving, electrical and lighting improvements, and pavement markings. Bidders must comply with all relevant federal nondiscrimination and civil rights laws, including specific federal clauses and wage provisions. All required information and pre-qualification statements must be provided with the bid. No oral interpretation will be made to any bidder as to the meaning of the Specifications, including Drawings. Neither the OWNER nor the ENGINEER will be responsible for oral interpretations. Every request for such an interpretation shall be made in writing to the ENGINEER, J-U-B ENGINEERS, Inc., 392 E. Winchester St., Ste 300, Salt Lake City, UT 84107. Any inquiry received seven or more days prior to the date fixed for opening of bids will be given consideration Questions and requests for clarifications received after 5:00 pm, local time on Friday, March 20, 2026, will not be addressed.

Post-Bid

Transportation Terminals

$6,000,000.00

Public - City

Paving, Site Work

22

20

8

6

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
93
Bidding Soon
886
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2026

May 25, 2026

Project location map

2050 N 300 W, Spanish Fork, UT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.