BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2026 at 8:00 PM

Updated March 12, 2026

Site work for a water / sewer project in Spanish Fork, Utah. Completed plans call for site work for a water / sewer project.

As of March 10, 2026, project was awarded to Cody Ekker Construction, Inc., awarded amount is $345,944.50 Replace waterline from 400 N Main St to 200 W Waterline Replacement. Question Deadline 02/17/2026 at 3:00 PM MT Online Portal . The Bid shall be submitted on the BID SCHEDULE bound herein or on the Virtual Bid system. All bids must be made on the Virtual Bid system or the required Bid Form. All blank spaces for bid prices must be filled in, in ink or typewritten, and the Bid Form must be fully completed and executed when submitted. Only one copy of the Bid Form is required. The OWNER may waive any informalities or minor defects or reject any and all bids. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered. No Bidder may withdraw a bid within 60 days after the actual date of the opening thereof. Should there be reasons why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the OWNER and the Bidder. Bidders must satisfy themselves of the accuracy of the estimated quantities in the Bid Schedule by examination of the site and a review of the drawings and specifications including addenda. After bids have been submitted, the Bidder shall not assert that there was a misunderstanding concerning the quantities of work or of the nature of the work to be done. The OWNER shall provide to Bidders prior to bidding, all information which is pertinent to, and delineates and describes, the land owned and right-of-ways acquired or to be acquired. The Contract Documents contain the provisions required for the construction of the project. Information obtained from an officer, agent, or employee of the OWNER or any other person shall not affect the risks or obligations assumed by the Contractor or relieve him from fulfilling any of the conditions of the contract. Each bid must be accompanied by a Bid Bond payable to the OWNER for five percent of the total amount of the bid. Any bid submitted without a Bid Bond will not be considered for award until a bid bond is received. As soon as the bid prices have been compared, the owner will return the bonds of all except the three lowest responsible Bidders. When the agreement is executed the bonds of the two remaining unsuccessful Bidders will be returned. The Bid Bond of the successful Bidder will be retained until the Payment Bond and Performance Bond have been executed and approved, after which it will be returned. A certified check may be used in lieu of a Bid Bond.

Award

Water / Sewer

$345,945.00

Public - City

Site Work

9

16

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
3
Bidding Soon
751
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2026

March 23, 2026

Project location map

Multiple Locations, Spanish Fork, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.